Exam Name: | CompTIA A+ Certification Exam: Core 1 | ||
Exam Code: | 220-1101 Dumps | ||
Vendor: | CompTIA | Certification: | A+ |
Questions: | 865 Q&A's | Shared By: | myra |
An engineer is experiencing unexpected reboots on a graphics workstation when rendering complex 3-D models. The workstation is configured with a 115V power supply that is rated at 200W and connected to a UPS. The central processing unit contains 16 hyperthreaded cores, and a discrete graphics solution utilizing an 8-pin power connector is installed in a PCI Express x16 slot. Which of the following indicates where the technician should begin troubleshooting?
A network administrator was notified that laptop users are unable to access or ping any network resources on the corporate network. Which of the following should the network administrator check FIRST?
A company wants to use client-side visualization for application testing. Which of the following configurations would BEST support this goal?
A)
B)
C)
D)
A user requested upgrades to a company-issued laptop to increase its performance while working with a large database stored on drive C. Which of the following tasks should a systems administrator complete to BEST meet this goal? (Select TWO).