Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cram70off

Cisco Updated 350-601 Exam Questions and Answers by fergus

Page: 3 / 31

Cisco 350-601 Exam Overview :

Exam Name: Implementing Cisco Data Center Core Technologies v1.1 (350-601 DCCOR)
Exam Code: 350-601 Dumps
Vendor: Cisco Certification: CCNP Data Center
Questions: 422 Q&A's Shared By: fergus
Question 12

What is the impact of a nondisruptive upgrade on fabric and modular switches?

Options:

A.

During the upgrade. new devices cannot log in to the fabric.

B.

When the installation is complete, the system BIOS must be updated.

C.

If a zone server merge is in progress, the upgrade continues without interruption.

D.

The upgrade disrupts the control plane for more than 120 seconds.

Discussion
Question 13

An engineer performs a Cisco UCS C480 ML M5 installation from a Cisco UCS Manager As a part of the design the server must perform an iSCSI bool from the storage array Which configuration must be performed in the SAN settings in the root organization to satisfy that condition?

Options:

A.

Implement a WWPN pool.

B.

Create a virtual iSCSI vNIC.

C.

Enable a host SAN pool.

D.

Create an IQN suffix pool.

Discussion
Question 14

Which two actions are needed to configure a single Cisco APIC controller for a Cisco ACI fabric for the first time? (Choose two.)

Options:

A.

Register the APIC that is connected to the switch.

B.

Configure the leaf switch where the Cisco APIC is connected, using CLI to allow APIC connectivity.

C.

Register the switches that are discovered through LLDP.

D.

Configure the first Cisco APIC controller.

E.

Register all leaf and spine switches.

Discussion
Question 15

Questions 15

Refer to the exhibit. An engineer must configure infrastructure monitoring in a Cisco UCS domain to monitor traffic on the Cisco fabric interconnect A and Cisco fabric interconnect B port links connected to Cisco MDS switches SW1 and SW2. The monitored traffic must be sent to Cisco Intersight at 20 Gbps for further analysis. Which command must be run on a UCS device after the create eth-mon-eession EthMonitor1/0 command is run?

Options:

A.

set direction transmit

B.

create fc-mon-session storage

C.

set speed 20gbps

D.

create dest-interface 1 1

Discussion
Josie
I just passed my certification exam using their dumps and I must say, I was thoroughly impressed.
Fatimah Aug 26, 2026
You’re right. The dumps were authentic and covered all the important topics. I felt confident going into the exam and it paid off.
Madeleine
Passed my exam with my dream score…. Guys do give these dumps a try. They are authentic.
Ziggy Aug 27, 2026
That's really impressive. I think I might give Cramkey Dumps a try for my next certification exam.
Osian
Dumps are fantastic! I recently passed my certification exam using these dumps and I must say, they are 100% valid.
Azaan Aug 3, 2026
They are incredibly accurate and valid. I felt confident going into my exam because the dumps covered all the important topics and the questions were very similar to what I saw on the actual exam. The team of experts behind Cramkey Dumps make sure the information is relevant and up-to-date.
Syeda
I passed, Thank you Cramkey for your precious Dumps.
Stella Aug 12, 2026
That's great. I think I'll give Cramkey Dumps a try.
Page: 3 / 31
Title
Questions
Posted

350-601
PDF

$34.5  $114.99

350-601 Testing Engine

$40.5  $134.99

350-601 PDF + Testing Engine

$52.5  $174.99