Black Friday Special: Limited Time 80% Discount Offer! Use coupon code below to save on all exam bundles! - Ends in 0d 00h 00m 00s - Coupon code: cram80

Cisco Updated 350-601 Exam Questions and Answers by fergus

Page: 3 / 31

Cisco 350-601 Exam Overview :

Exam Name: Implementing Cisco Data Center Core Technologies v1.1 (350-601 DCCOR)
Exam Code: 350-601 Dumps
Vendor: Cisco Certification: CCNP Data Center
Questions: 422 Q&A's Shared By: fergus
Question 12

What is the impact of a nondisruptive upgrade on fabric and modular switches?

Options:

A.

During the upgrade. new devices cannot log in to the fabric.

B.

When the installation is complete, the system BIOS must be updated.

C.

If a zone server merge is in progress, the upgrade continues without interruption.

D.

The upgrade disrupts the control plane for more than 120 seconds.

Discussion
Question 13

An engineer performs a Cisco UCS C480 ML M5 installation from a Cisco UCS Manager As a part of the design the server must perform an iSCSI bool from the storage array Which configuration must be performed in the SAN settings in the root organization to satisfy that condition?

Options:

A.

Implement a WWPN pool.

B.

Create a virtual iSCSI vNIC.

C.

Enable a host SAN pool.

D.

Create an IQN suffix pool.

Discussion
Question 14

Which two actions are needed to configure a single Cisco APIC controller for a Cisco ACI fabric for the first time? (Choose two.)

Options:

A.

Register the APIC that is connected to the switch.

B.

Configure the leaf switch where the Cisco APIC is connected, using CLI to allow APIC connectivity.

C.

Register the switches that are discovered through LLDP.

D.

Configure the first Cisco APIC controller.

E.

Register all leaf and spine switches.

Discussion
Question 15

Questions 15

Refer to the exhibit. An engineer must configure infrastructure monitoring in a Cisco UCS domain to monitor traffic on the Cisco fabric interconnect A and Cisco fabric interconnect B port links connected to Cisco MDS switches SW1 and SW2. The monitored traffic must be sent to Cisco Intersight at 20 Gbps for further analysis. Which command must be run on a UCS device after the create eth-mon-eession EthMonitor1/0 command is run?

Options:

A.

set direction transmit

B.

create fc-mon-session storage

C.

set speed 20gbps

D.

create dest-interface 1 1

Discussion
Yusra
I passed my exam. Cramkey Dumps provides detailed explanations for each question and answer, so you can understand the concepts better.
Alisha Oct 20, 2026
I recently used their dumps for the certification exam I took and I have to say, I was really impressed.
Vienna
I highly recommend them. They are offering exact questions that we need to prepare our exam.
Jensen Oct 3, 2026
That's great. I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Cecilia
Yes, I passed my certification exam using Cramkey Dumps.
Helena Oct 6, 2026
Great. Yes they are really effective
Zayaan
Successfully aced the exam… Thanks a lot for providing amazing Exam Dumps.
Harmony Oct 19, 2026
That's fantastic! I'm glad to hear that their dumps helped you. I also used them and found it accurate.
Georgina
I used Cramkey Dumps to prepare for my recent exam and I have to say, they were a huge help.
Corey Oct 17, 2026
Really? How did they help you? I know these are the same questions appears in exam. I will give my try. But tell me if they also help in some training?
Page: 3 / 31
Title
Questions
Posted

350-601
PDF

$26  $129.99

350-601 Testing Engine

$30  $149.99

350-601 PDF + Testing Engine

$38  $189.99