Big Black Friday Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Cisco Updated 350-601 Exam Questions and Answers by seb

Page: 18 / 22

Cisco 350-601 Exam Overview :

Exam Name: Implementing Cisco Data Center Core Technologies (350-601 DCCOR)
Exam Code: 350-601 Dumps
Vendor: Cisco Certification: CCNP Data Center
Questions: 305 Q&A's Shared By: seb
Question 72

Refer to the exhibit. An engineer must connect a Cisco MDS Series Switch to a Cisco UCS domain using a port channel, but the link fails to activate. Which command activates the interface?

Options:

A.

switchport speed 8000

B.

switchport trunk mode off

C.

switchport rate-mode shared

D.

switchport mode F

Discussion
Question 73

An engineer needs to connect Cisco UCS Manager to an external storage array. Due to budget limitations, the engineer must connect a Cisco UCS manager directly to an FC storage port. Which two actions must be taken to complete this connection? (Choose two)

Options:

A.

Configure the fabric interconnect in FC switch mode

B.

Create a storage connection policy

C.

Set FC zoning to disabled when creating the VSAN

D.

Configure the fabric interconnect m end-host mode

E.

Create the required VSAN in the SAN cloud

Discussion
Question 74

An engineer must recover the Cisco UCS system. The full backup is available on a backup SCP server. Which set of actions recovers the configuration of the Cisco UCS Manager?

Options:

A.

Create a scheduled restore job. Reboot the UCS Manager.

B.

Create an import-config task Set the action to Replace.

C.

Factory reset the fabric interconnect. Select the Restore feature.

D.

Copy the backup file to a USB drive. Copy the running-config.

Discussion
Question 75

An engineer must analyze packets arriving from a server port on a Cisco Nexus 9000 Series Switch. The packet sniffer is located on a different switch from the one the server is currently connected to. The packet capture must meet these requirements:

    It must capture all incoming packets on the switch port.

    It must capture the first 1000 bytes of the packet to conserve bandwidth.

Which action must be taken to meet these requirements?

Options:

A.

Configure the marker-packet to 1000.

B.

Implement an ACL with the packet-length of 1000.

C.

Enable the MTU size of 1000.

D.

Set rate-limiting to 1000.

Discussion
Josephine
I want to ask about their study material and Customer support? Can anybody guide me?
Zayd Oct 15, 2025
Yes, the dumps or study material provided by them are authentic and up to date. They have a dedicated team to assist students and make sure they have a positive experience.
Syeda
I passed, Thank you Cramkey for your precious Dumps.
Stella Oct 15, 2025
That's great. I think I'll give Cramkey Dumps a try.
Ernest
That's amazing. I think I'm going to give Cramkey Dumps a try for my next exam. Thanks for telling me about them! CramKey admin please share more questions……You guys are amazing.
Nate Oct 6, 2025
I failed last week, I never know this site , but amazed to see all these questions were in my exam week before. I feel bad now, why I didn’t bother this site. Thanks Cramkey, Excellent Job.
Joey
I highly recommend Cramkey Dumps to anyone preparing for the certification exam. They have all the key information you need and the questions are very similar to what you'll see on the actual exam.
Dexter Oct 6, 2025
Agreed. It's definitely worth checking out if you're looking for a comprehensive and reliable study resource.
Page: 18 / 22
Title
Questions
Posted

350-601
PDF

$40.25  $114.99

350-601 Testing Engine

$47.25  $134.99

350-601 PDF + Testing Engine

$61.25  $174.99