Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Cisco Updated 350-601 Exam Questions and Answers by seb

Page: 18 / 22

Cisco 350-601 Exam Overview :

Exam Name: Implementing Cisco Data Center Core Technologies (350-601 DCCOR)
Exam Code: 350-601 Dumps
Vendor: Cisco Certification: CCNP Data Center
Questions: 305 Q&A's Shared By: seb
Question 72

Refer to the exhibit. An engineer must connect a Cisco MDS Series Switch to a Cisco UCS domain using a port channel, but the link fails to activate. Which command activates the interface?

Options:

A.

switchport speed 8000

B.

switchport trunk mode off

C.

switchport rate-mode shared

D.

switchport mode F

Discussion
Question 73

An engineer needs to connect Cisco UCS Manager to an external storage array. Due to budget limitations, the engineer must connect a Cisco UCS manager directly to an FC storage port. Which two actions must be taken to complete this connection? (Choose two)

Options:

A.

Configure the fabric interconnect in FC switch mode

B.

Create a storage connection policy

C.

Set FC zoning to disabled when creating the VSAN

D.

Configure the fabric interconnect m end-host mode

E.

Create the required VSAN in the SAN cloud

Discussion
Question 74

An engineer must recover the Cisco UCS system. The full backup is available on a backup SCP server. Which set of actions recovers the configuration of the Cisco UCS Manager?

Options:

A.

Create a scheduled restore job. Reboot the UCS Manager.

B.

Create an import-config task Set the action to Replace.

C.

Factory reset the fabric interconnect. Select the Restore feature.

D.

Copy the backup file to a USB drive. Copy the running-config.

Discussion
Question 75

An engineer must analyze packets arriving from a server port on a Cisco Nexus 9000 Series Switch. The packet sniffer is located on a different switch from the one the server is currently connected to. The packet capture must meet these requirements:

    It must capture all incoming packets on the switch port.

    It must capture the first 1000 bytes of the packet to conserve bandwidth.

Which action must be taken to meet these requirements?

Options:

A.

Configure the marker-packet to 1000.

B.

Implement an ACL with the packet-length of 1000.

C.

Enable the MTU size of 1000.

D.

Set rate-limiting to 1000.

Discussion
Miley
Hey, I tried Cramkey Dumps for my IT certification exam. They are really awesome and helped me pass my exam with wonderful score.
Megan Aug 24, 2025
That’s great!!! I’ll definitely give it a try. Thanks!!!
Pippa
I was so happy to see that almost all the questions on the exam were exactly what I found in their Dumps.
Anastasia Aug 27, 2025
You are right…It was amazing! The Cramkey Dumps were so comprehensive and well-organized, it made studying for the exam a breeze.
Nell
Are these dumps reliable?
Ernie Aug 6, 2025
Yes, very much so. Cramkey Dumps are created by experienced and certified professionals who have gone through the exams themselves. They understand the importance of providing accurate and relevant information to help you succeed.
Rosalie
I passed. I would like to tell all students that they should definitely give Cramkey Dumps a try.
Maja Aug 4, 2025
That sounds great. I'll definitely check them out. Thanks for the suggestion!
Freddy
I passed my exam with flying colors and I'm confident who will try it surely ace the exam.
Aleksander Aug 20, 2025
Thanks for the recommendation! I'll check it out.
Page: 18 / 22
Title
Questions
Posted

350-601
PDF

$40.25  $114.99

350-601 Testing Engine

$47.25  $134.99

350-601 PDF + Testing Engine

$61.25  $174.99