Question 52

An engineer must perform a nondisruptive software upgrade on a dual supervisor Cisco Nexus 7000 series switch. What is the cause of the upgrade being disruptive?

Options:

A.

The show install all impact command is not issued before the upgrade.

B.

The kickstart image is installed by using the

C.

Attempt to simultaneously upgrade more than three cards

D.

Change to the configuration setting of the network connections during the upgrade process

Discussion
Stefan
Thank you so much Cramkey I passed my exam today due to your highly up to date dumps.
Ocean Jul 22, 2025
Agree….Cramkey Dumps are constantly updated based on changes in the exams. They also have a team of experts who regularly review the materials to ensure their accuracy and relevance. This way, you can be sure you're studying the most up-to-date information available.
Billy
It was like deja vu! I was confident going into the exam because I had already seen those questions before.
Vincent Jul 20, 2025
Definitely. And the best part is, I passed! I feel like all that hard work and preparation paid off. Cramkey is the best resource for all students!!!
Freddy
I passed my exam with flying colors and I'm confident who will try it surely ace the exam.
Aleksander Jul 24, 2025
Thanks for the recommendation! I'll check it out.
Walter
Yayyy!!! I passed my exam with the help of Cramkey Dumps. Highly appreciated!!!!
Angus Jul 17, 2025
YES….. I saw the same questions in the exam.
Question 53

Refer to the exhibit An engineer must restrict users assigned to the sangroup role on the Cisco MDS 9000 Series Switch from issuing commands

on VSANs 15 to 20 Which command must the engineer run to achieve

this objective?

Questions 53

Options:

A.

vsan policy deny vsan 15-20

B.

no permit vsan 15-20

C.

permit vsan 15-20

D.

no vsan policy deny

Discussion
Question 54

Drag and drop the hyperflex characteristics from the left onto the appropriate. HyperFlex Node types on the right. Not all options are used.

Questions 54

Options:

Discussion
Question 55

A Cisco UCS C-Series server needs to be installed in a data center. The server must be managed by using Cisco UCS Manager with a single cable for management and data traffic. Which set of commands must be run on the server after a physical connection is established?

A)

Questions 55

B)

Questions 55

C)

Questions 55

D)

Questions 55

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Discussion
Page: 13 / 14

350-601
PDF

$40.25  $114.99

350-601 Testing Engine

$47.25  $134.99

350-601 PDF + Testing Engine

$61.25  $174.99