The network team needs permissions to access the Cisco UCS B-Series Servers via the Cisco UCS Manager GUI to configure the network and collect information about faults. The administrator wants to assign these permissions to the newly configured user called netops. Which set of tasks must the administrator perform to accomplish these goals?
Refer to the exhibit An engineer must capture fiber channel traffic from the
server and the supervisory to the Cisco MDS 9000 Series Switch Fabric.
The traffic must be forwarded to the analyzer. Drag and drop the
code snippets from the right onto the blanks in the code on the
left to complete the configuration. Not all code snippets are used
An engineer is implementing VSANs on a Cisco MDS 9000 Series Switch with a native Fibre Channel. The deployment must meet these requirements:
The host on port fc1/1 must be assigned to VSAN 10.
The port channel 10 ISL must pass multiple VSANs. including VSAN 10.
Which configuration set meets these requirements?
Refer to the exhibit. An engineer configures FCoE in a newly installed data center Which configuration must be applied to activate VSAN 100 on VFC 100?