Question 28

An engineer builds a new Cisco ACI fabric Which VLAN must be configured as the infrastructure VLAN during the Cisco APIC setup script?

Options:

A.

a unique in-band management VLAN

B.

a unique native VLAN

C.

a unique VLAN within the network

D.

a unique 006 management VLAN

Discussion
Question 29

Questions 29

Refer to the exhibit. A network engineer must retrieve the network interface name from a JSON object. The engineer loads the JSON into a Python dictionary named json_object. Which code snippet completes the Python script?

Questions 29

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Discussion
Question 30

A customer data center experiences bandwidth contention that affects the servers connected to the NPV enabled switch The NPV switch is connected to the NPIV switch using two 10 Gb uplinks but the traffic originating front the connected hosts to the core switch exceeds the available bandwidth The engineers decided to add a third uplink to the NPV server to increase the available bandwidth Which set of commands must be used to provision the new uplink?

Options:

A.

switch2(config)# npv auto-load-balance disruptive

! uplink to NPV Core

switch2(config-if)# switchport mode np

B.

switch2(config)# port-channel load-balance ethernet source-dest-port

! uplink to NPV Core

switch2(config-if)# switchport mode np

C.

switch2(config)# npv traffic-map server-interface

! uplink to NPV Core

switch2(config-if)# switchport mode npiv

D.

! uplink to NPV Core

switch2(config-if)# switchport mode npiv

Discussion
Question 31

Questions 31

Refer to the exhibit. An engineer configures FCoE in a newly installed data center Which configuration must be applied to activate VSAN 100 on VFC 100?

Options:

A.

Allow VSAN 100 on interface eth1/12.

B.

Map an FCoE VLAN to VSAN 100.

C.

Configure a VLAN on VFC 100.

D.

Issue the shutdown lan command on VFC 100

Discussion
Ernest
That's amazing. I think I'm going to give Cramkey Dumps a try for my next exam. Thanks for telling me about them! CramKey admin please share more questions……You guys are amazing.
Nate Dec 19, 2025
I failed last week, I never know this site , but amazed to see all these questions were in my exam week before. I feel bad now, why I didn’t bother this site. Thanks Cramkey, Excellent Job.
Ari
Can anyone explain what are these exam dumps and how are they?
Ocean Dec 20, 2025
They're exam preparation materials that are designed to help you prepare for various certification exams. They provide you with up-to-date and accurate information to help you pass your exams.
Lennie
I passed my exam and achieved wonderful score, I highly recommend it.
Emelia Dec 23, 2025
I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Andrew
Are these dumps helpful?
Jeremiah Dec 22, 2025
Yes, Don’t worry!!! I'm confident you'll find them to be just as helpful as I did. Good luck with your exam!
Page: 7 / 22
Title
Questions
Posted

350-601
PDF

$28.75  $114.99

350-601 Testing Engine

$33.75  $134.99

350-601 PDF + Testing Engine

$43.75  $174.99