Exam Name: | Implementing Cisco Data Center Core Technologies (350-601 DCCOR) | ||
Exam Code: | 350-601 Dumps | ||
Vendor: | Cisco | Certification: | CCNP Data Center |
Questions: | 190 Q&A's | Shared By: | raina |
Refer to the exhibit. An engineer is configuring Cisco Data Center Network Manager to automate the provisioning of Cisco Nexus 9000 Series Switches. The engineer must configure user access for network engineers to permit device operations in Interface Manager. The solution must hide Admin and Config Menu items in Interface Manager Which two roles must be assigned to the network engineers to meet these requirements? (Choose two.)
An engineer is implementing a Cisco ACI fabric and must use static VLAN range as part of a VMM deployment. The static VLAN must be incorporated into the dynamic VLAN pool. The existing VLAN pool is set for dynamic allocation. Which action accomplishes this goal?
An engineer needs to install a new package on a Cisco Nexus 9000 Series Switch. What is the impact of running the install commit
A Cisco UCS user called "Employee1" accidentally changed the boot policy of the Cisco UCS server at the Cisco UCS Manager root level. This change impacted all service profiles and their storage connectivity was lost. The system administrator wants to prevent this issue from recurring in the future. The new security policy mandates that access must be restricted up to the organization level and prevent other users from modifying root policies. Which action must be taken to meet these requirements?