Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Cisco Updated 350-601 Exam Questions and Answers by zayyan

Page: 4 / 28

Cisco 350-601 Exam Overview :

Exam Name: Implementing Cisco Data Center Core Technologies (350-601 DCCOR)
Exam Code: 350-601 Dumps
Vendor: Cisco Certification: CCNP Data Center
Questions: 382 Q&A's Shared By: zayyan
Question 16

An engineer must configure Protocol Independent Multicast on two Cisco Nexus 9000 Series Switches. The engineer must ensure that the chosen rendezvous point (RP) uses a mapping agent and only supports one RP per multicast group. Which type of RP must be used on both switches to meet these requirements?

Options:

A.

bootstrap router

B.

static

C.

Auto-RP

D.

Anycast-RP

Discussion
Question 17

Questions 17

Refer to the exhibit. The router R1 and N9K1 establish EIGRP neighborship. R1 is advertising network 10.1.1.15/32 to N9K1 and N9K2 and N9K3 are forming the OSPF neighborship over area 1 Which configuration prevents N9K3 from receiving external LSA for network 10.1.1.15/32?

A)

Questions 17

B)

Questions 17

C)

Questions 17

D)

Questions 17

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Discussion
Question 18

Which virtualization feature is provided by network-attached storage?

Options:

A.

ALUA path redirection

B.

hypervisor host boot LUN

C.

VM cluster shared disk

D.

raw device passthrough

Discussion
Question 19

An engineer must create a scheduler configuration to create two backup jobs per day. The backup file must be copied to a server in the operations VRF. Which configuration accomplishes this task?

Options:

A.

scheduler schedule name CNFGBACKUP job name BACKUP-JOB copy running-config tftp:/10.19.11.12/$(SWITCHNAME)-$(TIMESTAMP).cfg vrf operations time start now repeat 12:00

B.

scheduler schedule name CNFGBACKUP job name BACKUP-JOB show tech-support | redirect vrf operations tftp:/10.19.11.12/S(SWITCHNAME)-S(TIMESTAMP).cfg time start daily 12:30 0:30

C.

scheduler schedule name CNFGBACKUP job name BACKUP-JOB copy startup-config tftp:/10.19.11.12/$(SWITCHNAME)-S(TIMESTAMP).cfg time daily 12:30 0:30

D.

scheduler schedule name CNFGBACKUP Job name BACKUP-JOB copy vrf operations config tftp:/10.19.11.12/$(SWITCHNAME)-S(TIMESTAMP).cfg time start 12:30 repeat 12

Discussion
Josie
I just passed my certification exam using their dumps and I must say, I was thoroughly impressed.
Fatimah May 16, 2026
You’re right. The dumps were authentic and covered all the important topics. I felt confident going into the exam and it paid off.
Elise
I've heard that Cramkey is one of the best websites for exam dumps. They have a high passing rate and the questions are always up-to-date. Is it true?
Cian May 4, 2026
Definitely. The dumps are constantly updated to reflect the latest changes in the certification exams. And I also appreciate how they provide explanations for the answers, so I could understand the reasoning behind each question.
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline May 3, 2026
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Conor
I recently used these dumps for my exam and I must say, I was impressed with their authentic material.
Yunus May 22, 2026
Exactly…….The information in the dumps is so authentic and up-to-date. Plus, the questions are very similar to what you'll see on the actual exam. I felt confident going into the exam because I had studied using Cramkey Dumps.
Page: 4 / 28
Title
Questions
Posted

350-601
PDF

$40.25  $114.99

350-601 Testing Engine

$47.25  $134.99

350-601 PDF + Testing Engine

$61.25  $174.99