Question 124

A Cisco IMC on the Cisco UCS C-Series Server must be configured with VLAN ID 110 and a priority value of 20. Which command set meets these requirements?

Options:

A.

Server# scope cimc -

Server /cimc # scope vlan -

Server /cimc/network # enable vlan

Server /cimc/network *# set vlan-id 110

Server /cimc/network *# set vlan-priority 20

Server /cimc/network *# commit

B.

Server# scope cimc -

Server /cimc # scope network -

Server /cimc/network # set vlan-enabled yes

Server /cimc/network *# set vlan-id 110

Server /cimc/network *# set vlan-priority 20

Server /cimc/network *# commit

C.

Server# scope cimc -

Server /cimc # scope network -

Server /cimc/network # switchport mode trunk

Server /cimc/network *# switchport trunk native vlan 110

Server /cimc/network *# spanning-tree portfast

Server /cimc/network *# copy run start

D.

Server# scope cimc -

Server /cimc # scope network -

Server /cimc/network # switchport mode access

Server /cimc/network *# switchport access 110

Server /cimc/network *# spanning-tree portfast

Server /cimc/network *# copy run start

Discussion
Question 125

A network architect wants to propose a scalable network monitoring solution in which data is repeatedly acquired from network devices. The solution must use a push model and provide close to realtime access to operational data. Which technology must be used to meet these requirements?

Options:

A.

streaming telemetry

B.

logging

C.

SNMPv3

D.

CLI-based scripting

Discussion
Question 126

Refer to the exhibit.

Questions 126

During a recent outage, a network engineer discovered that host A started to experience intermittent connectivity, when Leaf102 was down. Drag and drop the code snippets from the bottom onto the boxes in the code to resolve the problem. Not all code snippets are used.

Questions 126

Options:

Discussion
Ella-Rose
Amazing website with excellent Dumps. I passed my exam and secured excellent marks!!!
Alisha Aug 17, 2024
Extremely accurate. They constantly update their materials with the latest exam questions and answers, so you can be confident that what you're studying is up-to-date.
Hassan
Highly Recommended Dumps… today I passed my exam! Same questions appear. I bought Full Access.
Kasper Oct 20, 2024
Hey wonderful….so same questions , sounds good. Planning to write this week, I will go for full access today.
Wyatt
Passed my exam… Thank you so much for your excellent Exam Dumps.
Arjun Sep 18, 2024
That sounds really useful. I'll definitely check it out.
Ayesha
They are study materials that are designed to help students prepare for exams and certification tests. They are basically a collection of questions and answers that are likely to appear on the test.
Ayden Oct 16, 2024
That sounds interesting. Why are they useful? Planning this week, hopefully help me. Can you give me PDF if you have ?
Question 127

An engineer must add a new VRF (DC DC) to the network that runs with Multiprotocol Border Gateway Protocol (MP-BGP) and EVPN.The requirement for the new VRF is to allow communication of network prefixes between PE1 and PE2. Which two sets of steps should be taken to complete the VRF configuration? (Choose two)

Questions 127

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

E.

Option E

Discussion
Page: 31 / 36
Title
Questions
Posted

350-601
PDF

$46  $114.99

350-601 Testing Engine

$54  $134.99

350-601 PDF + Testing Engine

$70  $174.99