Question 32

Which of the following activities is most appropriate in the implementation of a lean production strategy?

Options:

A.

Increasing service through inventory

B.

Implementing a push strategy

C.

Implementing manufacturing cells

D.

Implementing batch type operations

Discussion
Question 33

Which of the following objectives is a major principle of theory of constraints (TOC) accounting when applied to a supply chain?

Options:

A.

Total inventory reduction

B.

Maximize process utilization

C.

Maximize revenue generation

D.

Product design simplification

Discussion
Miriam
Highly recommended Dumps. 100% authentic and reliable. Passed my exam with wonderful score.
Milan Dec 20, 2025
I see. Thanks for the information. I'll definitely keep Cramkey in mind for my next exam.
Anya
I must say they're considered the best dumps available and the questions are very similar to what you'll see in the actual exam. Recommended!!!
Cassius Dec 28, 2025
Yes, they offer a 100% success guarantee. And many students who have used them have reported passing their exams with flying colors.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Dec 8, 2025
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
River
Hey, I used Cramkey Dumps to prepare for my recent exam and I passed it.
Lewis Dec 22, 2025
Yeah, I used these dumps too. And I have to say, I was really impressed with the results.
Question 34

Which of the following metrics would be most appropriate for a group of trading partners that is trying to gain competitive advantage through supply chain reliability?

Options:

A.

Cash-to-cash cycle time

B.

Supply chain response time

C.

Order-fill rate performance

D.

Value-added productivity per employee

Discussion
Question 35

A key challenge in managing the supply chain for an innovative product is that:

Options:

A.

contribution margins will be slim.

B.

the product life cycle will be long.

C.

product demand will be volatile.

D.

inventory levels must be minimal.

Discussion
Page: 8 / 46
Title
Questions
Posted

CSCP
PDF

$26.25  $104.99

CSCP Testing Engine

$31.25  $124.99

CSCP PDF + Testing Engine

$41.25  $164.99