Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cram70off

Cisco Updated 400-007 Exam Questions and Answers by melanie

Page: 2 / 37

Cisco 400-007 Exam Overview :

Exam Name: Cisco Certified Design Expert (CCDE v3.1)
Exam Code: 400-007 Dumps
Vendor: Cisco Certification: CCDE v3.0
Questions: 503 Q&A's Shared By: melanie
Question 8

A BGP route reflector in the network is taking longer than expected to converge during large network changes. Troubleshooting shows that the router cannot handle all the TCP acknowledgements during route updates. Which action can be performed to tune the device performance?

Options:

A.

Increase the size of the hold queue.

B.

Increase the size of the large buffers.

C.

Decrease the size of the small buffers.

D.

Increase the keepalive timers for each BGP neighbor.

Discussion
Question 9

What are two reasons for a company to prefer a hybrid approach rather than a mixed approach while transitioning to a software-defined network? (Choose two.)

Options:

A.

Mixed approach creates more complexity which makes troubleshooting more difficult

B.

Hybrid approach allows box-by-box transition to spread out the costs

C.

Mixed approach is more palatable to the small-size companies

D.

Hybrid approach allows to deploy portions of the network without impacting performance

E.

Hybrid approach is more palatable to the large-size companies

Discussion
Question 10

An engineer must redesign the QoS strategy for Company XYZ The current network is experiencing many dropped packets due to oversubscription of the guaranteed bandwidth allocated by the service provider Company XYZ wants a design with a QoS strategy that controls the traffic flow leaving the Edge router to minimize packet drops Which QoS technique can be recommended as a solution?

Options:

A.

LLQ

B.

rate-Limiting

C.

policing

D.

traffic shaping

Discussion
Question 11

Company XYZ, a global content provider, owns data centers on different continents. Their data center design involves a standard three-layer design with a Layer 3-only core. HSRP is used as the FHRP. They require VLAN extension across access switches in all data centers, and they plan to purchase a Layer 2 interconnection between two of their data centers in Europe. In the absence of other business or technical constraints, which termination point is optimal for the Layer 2 interconnection?

Options:

A.

at the core layer, to offer the possibility to isolate STP domains

B.

at the aggregation layer because it is the Layer 2 to Layer 3 demarcation point

C.

at the access layer because the STP root bridge does not need to align with the HSRP active node

D.

at the core layer because all external connections must terminate there for security reasons

Discussion
Neve
Will I be able to achieve success after using these dumps?
Rohan Aug 8, 2026
Absolutely. It's a great way to increase your chances of success.
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub Aug 16, 2026
That's great to hear. I am going to try them soon.
Billy
It was like deja vu! I was confident going into the exam because I had already seen those questions before.
Vincent Aug 25, 2026
Definitely. And the best part is, I passed! I feel like all that hard work and preparation paid off. Cramkey is the best resource for all students!!!
Joey
I highly recommend Cramkey Dumps to anyone preparing for the certification exam. They have all the key information you need and the questions are very similar to what you'll see on the actual exam.
Dexter Aug 25, 2026
Agreed. It's definitely worth checking out if you're looking for a comprehensive and reliable study resource.
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari Aug 20, 2026
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Page: 2 / 37
Title
Questions
Posted

400-007
PDF

$119.7  $399

400-007 Testing Engine

$134.7  $449

400-007 PDF + Testing Engine

$179.7  $599