Question 8

A BGP route reflector in the network is taking longer than expected to converge during large network changes. Troubleshooting shows that the router cannot handle all the TCP acknowledgements during route updates. Which action can be performed to tune the device performance?

Options:

A.

Increase the size of the hold queue.

B.

Increase the size of the large buffers.

C.

Decrease the size of the small buffers.

D.

Increase the keepalive timers for each BGP neighbor.

Discussion
Ernest
That's amazing. I think I'm going to give Cramkey Dumps a try for my next exam. Thanks for telling me about them! CramKey admin please share more questions……You guys are amazing.
Nate Apr 3, 2026
I failed last week, I never know this site , but amazed to see all these questions were in my exam week before. I feel bad now, why I didn’t bother this site. Thanks Cramkey, Excellent Job.
Stefan
Thank you so much Cramkey I passed my exam today due to your highly up to date dumps.
Ocean Apr 4, 2026
Agree….Cramkey Dumps are constantly updated based on changes in the exams. They also have a team of experts who regularly review the materials to ensure their accuracy and relevance. This way, you can be sure you're studying the most up-to-date information available.
Sarah
Yeah, I was so relieved when I saw that the question appeared in the exam were similar to their exam dumps. It made the exam a lot easier and I felt confident going into it.
Aaliyah Apr 18, 2026
Same here. I've heard mixed reviews about using exam dumps, but for us, it definitely paid off.
Nylah
I've been looking for good study material for my upcoming certification exam. Need help.
Dolly Apr 4, 2026
Then you should definitely give Cramkey Dumps a try. They have a huge database of questions and answers, making it easy to study and prepare for the exam. And the best part is, you can be sure the information is accurate and relevant.
Question 9

What are two reasons for a company to prefer a hybrid approach rather than a mixed approach while transitioning to a software-defined network? (Choose two.)

Options:

A.

Mixed approach creates more complexity which makes troubleshooting more difficult

B.

Hybrid approach allows box-by-box transition to spread out the costs

C.

Mixed approach is more palatable to the small-size companies

D.

Hybrid approach allows to deploy portions of the network without impacting performance

E.

Hybrid approach is more palatable to the large-size companies

Discussion
Question 10

An engineer must redesign the QoS strategy for Company XYZ The current network is experiencing many dropped packets due to oversubscription of the guaranteed bandwidth allocated by the service provider Company XYZ wants a design with a QoS strategy that controls the traffic flow leaving the Edge router to minimize packet drops Which QoS technique can be recommended as a solution?

Options:

A.

LLQ

B.

rate-Limiting

C.

policing

D.

traffic shaping

Discussion
Question 11

Company XYZ, a global content provider, owns data centers on different continents. Their data center design involves a standard three-layer design with a Layer 3-only core. HSRP is used as the FHRP. They require VLAN extension across access switches in all data centers, and they plan to purchase a Layer 2 interconnection between two of their data centers in Europe. In the absence of other business or technical constraints, which termination point is optimal for the Layer 2 interconnection?

Options:

A.

at the core layer, to offer the possibility to isolate STP domains

B.

at the aggregation layer because it is the Layer 2 to Layer 3 demarcation point

C.

at the access layer because the STP root bridge does not need to align with the HSRP active node

D.

at the core layer because all external connections must terminate there for security reasons