New Year Special 75% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 75brite

Cisco Updated 400-007 Exam Questions and Answers by rahma

Page: 18 / 25

Cisco 400-007 Exam Overview :

Exam Name: Cisco Certified Design Expert (CCDE v3.1)
Exam Code: 400-007 Dumps
Vendor: Cisco Certification: CCDE v3.0
Questions: 349 Q&A's Shared By: rahma
Question 72

Company XYZ has implemented policy-based routing in their network. Which potential problem must be kept in mind about network reconvergence and PBR?

Options:

A.

It can limit network scalability

B.

It can create microloops during reconvergence

C.

It increases convergence time.

D.

It reduces convergence time.

Discussion
Question 73

Which two statements describe the functionality of OSPF packet-pacing timers? (Choose two.)

Options:

A.

The group-pacing timer controls the interval that is used for group and individual LSA refreshment

B.

OSPF flood-pacing timers allow dynamic control of the OSPF transmission queue size

C.

OSPF retransmission-pacing timers allow control of interpacket spacing between consecutive link-state update packets in the OSPF retransmission queue

D.

OSPF retransmission-pacing timers allow control of packet interleaving between nonconsecutive link-state update packets in the OSPF retransmission queue

E.

OSPF flood-pacing timers allow control of interpacket spacing between consecutive link-state update packets in the OSPF transmission queue

Discussion
Question 74

Company XYZ is planning to deploy primary and secondary (disaster recovery) data center sites. Each of these sites will have redundant SAN fabrics and data protection is expected between the data center sites. The sites are 100 miles (160 km) apart and target RPO/RTO are 3 hrs and 24 hrs, respectively. Which two considerations must Company XYZ bear in mind when deploying replication in their scenario? (Choose two.)

Options:

A.

Target RPO/RTO requirements cannot be met due to the one-way delay introduced by the distance between sites.

B.

VSANs must be routed between sites to isolate fault domains and increase overall availability.

C.

Synchronous data replication must be used to meet the business requirements.

D.

Asynchronous data replication should be used in this scenario to avoid performance impact in the primary site.

E.

VSANs must be extended from the primary to the secondary site to improve performance and availability.

Discussion
Zayaan
Successfully aced the exam… Thanks a lot for providing amazing Exam Dumps.
Harmony Dec 15, 2025
That's fantastic! I'm glad to hear that their dumps helped you. I also used them and found it accurate.
Melody
My experience with Cramkey was great! I was surprised to see that many of the questions in my exam appeared in the Cramkey dumps.
Colby Dec 6, 2025
Yes, In fact, I got a score of above 85%. And I attribute a lot of my success to Cramkey's dumps.
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline Dec 13, 2025
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Laila
They're such a great resource for anyone who wants to improve their exam results. I used these dumps and passed my exam!! Happy customer, always prefer. Yes, same questions as above I know you guys are perfect.
Keira Dec 15, 2025
100% right….And they're so affordable too. It's amazing how much value you get for the price.
Anaya
I found so many of the same questions on the real exam that I had already seen in the Cramkey Dumps. Thank you so much for making exam so easy for me. I passed it successfully!!!
Nina Dec 25, 2025
It's true! I felt so much more confident going into the exam because I had already seen and understood the questions.
Question 75

A company requires an RPO of less than 10 seconds to ensure business continuity. Which technology should be deployed?

Options:

A.

Geographically dispersed data centers with asynchronous replication

B.

A single data center with duplicated infrastructure, dual PSUs, and a UPS

C.

Geographically dispersed data centers with synchronous replication

D.

A single data center with duplicated infrastructure and dual PSUs

Discussion
Page: 18 / 25
Title
Questions
Posted

400-007
PDF

$99.75  $399

400-007 Testing Engine

$112.25  $449

400-007 PDF + Testing Engine

$149.75  $599