Question 88

Company XYZ has 30 sites using MPLS L3 VPN and is concerned about data integrity. They want a centralized configuration model and minimal overhead. Which technology can be used?

Options:

A.

S-VTI

B.

DMVPN

C.

MGRE

D.

GET VPN

Discussion
Mylo
Excellent dumps with authentic information… I passed my exam with brilliant score.
Dominik Nov 3, 2025
That's amazing! I've been looking for good study material that will help me prepare for my upcoming certification exam. Now, I will try it.
Josephine
I want to ask about their study material and Customer support? Can anybody guide me?
Zayd Nov 13, 2025
Yes, the dumps or study material provided by them are authentic and up to date. They have a dedicated team to assist students and make sure they have a positive experience.
Ilyas
Definitely. I felt much more confident and prepared because of the Cramkey Dumps. I was able to answer most of the questions with ease and I think that helped me to score well on the exam.
Saoirse Nov 2, 2025
That's amazing. I'm glad you found something that worked for you. Maybe I should try them out for my next exam.
Yusra
I passed my exam. Cramkey Dumps provides detailed explanations for each question and answer, so you can understand the concepts better.
Alisha Nov 7, 2025
I recently used their dumps for the certification exam I took and I have to say, I was really impressed.
Question 89

Drag and drop the optical technology design characteristics on the left to the correct optical technologies on the right. Not all options are used

Questions 89

Options:

Discussion
Question 90

Various teams in different organizations within an enterprise are preparing low-level design documents using a Waterfall project model. Input from relevant stakeholders was captured at the start of the project, and the scope has been defined. What impact will it have if stakeholders ask for changes before documentation is complete?

Options:

A.

This provides more opportunity to think outside the box.

B.

Rework is expected before the delivery.

C.

Significant effort and time are required.

D.

This provides a flexible approach to incorporate changes.

Discussion
Question 91

Company XYZ wants to redesign the Layer 2 part of their network to use all uplinks for increased performance, support host reachability with conversational learning, and avoid port-channels. Which other technique can be used?

Options:

A.

TRILL

B.

LISP

C.

MSTP

D.

Switch stack

Discussion
Page: 22 / 25
Title
Questions
Posted

400-007
PDF

$139.65  $399

400-007 Testing Engine

$157.15  $449

400-007 PDF + Testing Engine

$209.65  $599