| Exam Name: | CompTIA A+ Core 1 Exam (2025) | ||
| Exam Code: | 220-1201 Dumps | ||
| Vendor: | CompTIA | Certification: | A+ |
| Questions: | 405 Q&A's | Shared By: | lily-may |
A technician is diagnosing several device issues reported by employees.
INSTRUCTIONS
Click on each device to review the issue. Then select the appropriate issue and solution
from the drop-down menu. Each option may be used more than once.


A customer has contacted you about building two new desktops. The first desktop will be a gaming workstation. The customer requirements include:
Playing the newest games at a high frame rate
Fast game load times
Enough storage to have several games installed at once
High-end audio
No concern about cost
Running the current Windows OS
The second workstation will be a family workstation. The requirements include:
Capability for word processing, videoconferencing, and basic web surfing
Minimal cost, as long as it meets the requirements
Running the current Windows OS

An office manager reports that a printer is experiencing performance issues. Printouts
are smudging when they are handled, and, recently whenever they need to print legal
sized documents, the paper jams before anything is printed on it.
The following paper sizes are used:
Letter (8.5x11in/21.59x27.94cm)
Legal (8.5x14in/21.59x35.56cm)
Oversized (11x17in/27.94x43.18cm)


INSTRUCTIONS
Using the dropdown menus, select from the
available printer parts to replace only the
faulty components on the office printer to
resolve the stated issues.
If at any time you would like to bring back
the initial state of the simulation, please click
the Reset All button.
A customer recently experienced a power outage at a SOHO. The customer does not think the components are connected properly. A print job continued running for several minutes after the power failed, but the customer was not able to interact with the computer.
Once the UPS stopped beeping, all functioning devices also turned off.
In case of a future power failure, the customer wants to have the most time available to save cloud documents and shut down the computer without losing any data.
INSTRUCTIONS
-
Based on the customer's requirements, connect the customer's devices to the proper outlets. Select the power source for the Surge Protector and UPS. This may require reselecting dropdowns or removing tokens.
Each token may only be used once.
If at any time you would like to bring back the initial state of the simulation, please click the Reset All button.
