Big Halloween Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Cisco Updated 300-425 Exam Questions and Answers by anika

Page: 6 / 14

Cisco 300-425 Exam Overview :

Exam Name: Designing Cisco Enterprise Wireless Networks (ENWLSD)
Exam Code: 300-425 Dumps
Vendor: Cisco Certification: CCNP Enterprise
Questions: 256 Q&A's Shared By: anika
Question 24

A wireless engineer must optimize RF performance for multiple buildings with multiple types of construction and user density. Which two actions must be taken? (Choose two.)

Options:

A.

Configure Flexconnect groups for each building.

B.

Configure WMM profiles for each building.

C.

Configure AP groups for each area type.

D.

Configure RF profiles for each area type.

E.

Enable DTPC on the network.

Discussion
Cody
I used Cramkey Dumps to prepare and a lot of the questions on the exam were exactly what I found in their study materials.
Eric Oct 26, 2025
Really? That's great to hear! I used Cramkey Dumps too and I had the same experience. The questions were almost identical.
Annabel
I recently used them for my exam and I passed it with excellent score. I am impressed.
Amirah Oct 27, 2025
I passed too. The questions I saw in the actual exam were exactly the same as the ones in the Cramkey Dumps. I was able to answer the questions confidently because I had already seen and studied them.
Madeleine
Passed my exam with my dream score…. Guys do give these dumps a try. They are authentic.
Ziggy Oct 16, 2025
That's really impressive. I think I might give Cramkey Dumps a try for my next certification exam.
Rae
I tried using Cramkey dumps for my recent certification exam and I found them to be more accurate and up-to-date compared to other dumps I've seen. Passed the exam with wonderful score.
Rayyan Oct 3, 2025
I see your point. Thanks for sharing your thoughts. I might give it a try for my next certification exam.
Question 25

An engineer must deploy a wireless network in an open-plan environment that has three SSIDs using the 5 GHz band set to 40 MHz. Co-channel interference must be reduced. Which two actions must be taken? (Choose two.)

Options:

A.

Increase the number of SSIDs.

B.

Increase channel bonding in the 2.4 GHz band to 40 MHz.

C.

Disable band steering.

D.

Decrease channel bonding in the 5 GHz band to 20 MHz.

E.

Reduce the power of the AP.

Discussion
Question 26

An engineer performs a Layer 1 survey by using Metegeek chanalyzer only on the current operating channel. Which operating mode is configured for a Cisco CleanAIR AP?

Options:

A.

Local

B.

Sniffer

C.

Monitor

D.

SE-connect

Discussion
Question 27

During a wireless design all APs are mapped to designated controllers in case of a failure. The controllers are located in the same data center but in different racks. An AP failed over to a controller that was not defined on its High Availability tab. The customer does not want the AP to move back to its defined Cisco WLCs until they manually intervene. What needs to be addressed in the design?

Options:

A.

Set AP fallback to enabled.

B.

Set AP fallback to disabled.

C.

Change the HA SKU secondary unit option.

D.

Change the default mobility domain.

Discussion
Page: 6 / 14

300-425
PDF

$40.25  $114.99

300-425 Testing Engine

$47.25  $134.99

300-425 PDF + Testing Engine

$61.25  $174.99