Question 80

What might be considered a disadvantage of virtual communication?

Options:

A.

Digital communication links never seem to work as required.

B.

Communication being misunderstood.

C.

There is no method for providing feedback.

D.

This method of communication tends to be time consuming.

Discussion
Question 81

An issue that results in a change to scope or the baseline plan should be managed through:

Options:

A.

configuration control.

B.

change management.

C.

change control.

D.

scope management.

Discussion
Cecilia
Yes, I passed my certification exam using Cramkey Dumps.
Helena Jul 13, 2025
Great. Yes they are really effective
Atlas
What are these Dumps? Would anybody please explain it to me.
Reign Jul 28, 2025
These are exam dumps for a variety of IT certifications. They have a vast collection of updated questions and answers, which are very helpful in preparing for the exams.
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub Jul 29, 2025
That's great to hear. I am going to try them soon.
Alaia
These Dumps are amazing! I used them to study for my recent exam and I passed with flying colors. The information in the dumps is so valid and up-to-date. Thanks a lot!!!
Zofia Jul 5, 2025
That's great to hear! I've been struggling to find good study material for my exam. I will ty it for sure.
Question 82

Which of the following is a difference between deployment baselines in linear life cycles anditerative life cycles?

Options:

A.

Linear project life cycles set the deployment baseline for the whole project.

B.

In an iterative project life cycle the scope and quality are fixed in the deployment baseline.

C.

Only deployment baselines in iterative life cycles have an integrated baseline review.

D.

Only deployment baselines in linear life cycles have an integrated baseline review

Discussion
Question 83

Which key questions should be asked before a decision gate occurs?

1) Is the business case viable?

2) What has been achieved?

3) What is required for the next stage?

4) Are stakeholders properly engaged?

Options:

A.

1, 2 and 3

B.

1, 2 and 4

C.

2, 3 and 4

D.

1, 3 and 4

Discussion
Page: 20 / 30
Title
Questions
Posted

APM-PFQ
PDF

$36.75  $104.99

APM-PFQ Testing Engine

$43.75  $124.99

APM-PFQ PDF + Testing Engine

$57.75  $164.99