Question 104

A project manager has joined the sponsor to verify the last deliverable of the project. The sponsor is measuring and examining the deliverable to determine whether it meets the requirements and product acceptance criteria. Which activity is being performed?

Options:

A.

Inspection

B.

Prototyping

C.

Decision making

D.

Brainstorming

Discussion
Question 105

In which of the risk management processes is the processes is the project charter used as an input?

Options:

A.

Palm Risk Responses

B.

Implement Risk Responses

C.

Plan Risk Management

D.

Perform Quantitative Risk Responses

Discussion
Sarah
Yeah, I was so relieved when I saw that the question appeared in the exam were similar to their exam dumps. It made the exam a lot easier and I felt confident going into it.
Aaliyah Jul 27, 2025
Same here. I've heard mixed reviews about using exam dumps, but for us, it definitely paid off.
Ilyas
Definitely. I felt much more confident and prepared because of the Cramkey Dumps. I was able to answer most of the questions with ease and I think that helped me to score well on the exam.
Saoirse Jul 17, 2025
That's amazing. I'm glad you found something that worked for you. Maybe I should try them out for my next exam.
Josephine
I want to ask about their study material and Customer support? Can anybody guide me?
Zayd Jul 29, 2025
Yes, the dumps or study material provided by them are authentic and up to date. They have a dedicated team to assist students and make sure they have a positive experience.
Osian
Dumps are fantastic! I recently passed my certification exam using these dumps and I must say, they are 100% valid.
Azaan Jul 17, 2025
They are incredibly accurate and valid. I felt confident going into my exam because the dumps covered all the important topics and the questions were very similar to what I saw on the actual exam. The team of experts behind Cramkey Dumps make sure the information is relevant and up-to-date.
Question 106

A construction project is underway, and during... tasks impacted the painting work

A construction project is underway, and during the progress review the painter complained that the task could not be started because the mason has not finished the plastering job What kind ot relationship between the tasks impacted the painting work?

Options:

A.

Finish-to-Finish (FF)

B.

Start-to-Finish (SF)

C.

Finish-to-Start(FS)

D.

Start-to-Slart(SS)

Discussion
Question 107

A project team working on an automobile manufacturing project is detailing the parts needed for a car door design. The door is composed of several parts that have to be developed in sequence, as the frame is needed before other parts can be designed and built. What activity is the team involved in?

Options:

A.

Creating a work breakdown structure (WBS)

B.

Identifying risks and issues in the project

C.

Developing a stakeholder engagement plan

D.

Developing a communications management plan

Discussion
Page: 26 / 99
Title
Questions
Posted

CAPM
PDF

$42  $104.99

CAPM Testing Engine

$50  $124.99

CAPM PDF + Testing Engine

$66  $164.99