Question 32

Which of the following processes is necessary to ensure that the project employs all processes needed to meet its requirements?

Options:

A.

Perform Quality Control

B.

Quality Policy

C.

Perform Quality Assurance

D.

Quality Planning

Discussion
Addison
Want to tell everybody through this platform that I passed my exam with excellent score. All credit goes to Cramkey Exam Dumps.
Libby Oct 3, 2025
That's good to know. I might check it out for my next IT certification exam. Thanks for the info.
Syeda
I passed, Thank you Cramkey for your precious Dumps.
Stella Oct 15, 2025
That's great. I think I'll give Cramkey Dumps a try.
Cody
I used Cramkey Dumps to prepare and a lot of the questions on the exam were exactly what I found in their study materials.
Eric Oct 26, 2025
Really? That's great to hear! I used Cramkey Dumps too and I had the same experience. The questions were almost identical.
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby Oct 17, 2025
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Question 33

A team member from research and development tells you that her work is too creative to provide you with a fixed single estimate for the activity. You both decide to use the average labor hours per installation from past projects to predict the future.

This is an example of which of the following?

Options:

A.

Parametric estimating

B.

Three-point estimating

C.

Analogous estimating

D.

Monte Carlo analysis

Discussion
Question 34

A ________ estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).

Options:

A.

Parametric

B.

Bottom up.

C.

Budget

D.

Top down.

E.

Definitive.

Discussion
Question 35

The use of group creativity techniques as a tool and technique is done in which of the following processes?

Options:

A.

Plan Quality

B.

Collect Requirements

C.

Define Scope

D.

Perform Quality Control

Discussion
Page: 8 / 23
Title
Questions
Posted

ISEB-PM1
PDF

$42  $104.99

ISEB-PM1 Testing Engine

$50  $124.99

ISEB-PM1 PDF + Testing Engine

$66  $164.99