Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

Page: 1 / 25

Leadership in Energy and Environmental Design (LEED) LEED AP Building Design + Construction (LEED AP BD+C)

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update Jul 3, 2025
Total Questions : 337

To help you prepare for the LEED-AP-BD+C USGBC exam, we are offering free LEED-AP-BD+C USGBC exam questions. All you need to do is sign up, provide your details, and prepare with the free LEED-AP-BD+C practice questions. Once you have done that, you will have access to the entire pool of LEED AP Building Design + Construction (LEED AP BD+C) LEED-AP-BD+C test questions which will help you better prepare for the exam. Additionally, you can also find a range of LEED AP Building Design + Construction (LEED AP BD+C) resources online to help you better understand the topics covered on the exam, such as LEED AP Building Design + Construction (LEED AP BD+C) LEED-AP-BD+C video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic USGBC LEED-AP-BD+C exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 2

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

Options:

A.  

Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance

B.  

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.  

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.  

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Discussion 0
Questions 3

Qualifying spaces for the Sustainable Sites Credit, Places of Respite must

Options:

A.  

be located outdoors near a water feature

B.  

be located at least 20 ft. (6 m) from a smoking area

C.  

have provisions for direct medical care to be delivered in the area

D.  

have options for shade or indirect sun for a portion of seating spaces

Discussion 0
Kylo
What makes Cramkey Dumps so reliable? Please guide.
Sami Aug 29, 2024
Well, for starters, they have a team of experts who are constantly updating their material to reflect the latest changes in the industry. Plus, they have a huge database of questions and answers, which makes it easy to study and prepare for the exam.
Hendrix
Great website with Great Exam Dumps. Just passed my exam today.
Luka Aug 31, 2024
Absolutely. Cramkey Dumps only provides the latest and most updated exam questions and answers.
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari Sep 1, 2024
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Miriam
Highly recommended Dumps. 100% authentic and reliable. Passed my exam with wonderful score.
Milan Sep 24, 2024
I see. Thanks for the information. I'll definitely keep Cramkey in mind for my next exam.
Madeleine
Passed my exam with my dream score…. Guys do give these dumps a try. They are authentic.
Ziggy Sep 3, 2024
That's really impressive. I think I might give Cramkey Dumps a try for my next certification exam.
Questions 4

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

Options:

A.  

No action is necessary as the PV system is not required to be commissioned

B.  

The PV system installer should commission his own installations and share the results with the project owner

C.  

The Cx agent for the project must conduct or oversee the Cx of the PV system

D.  

The building's mechanical engineer should commission his own installations and share the results with the project owner

Discussion 0
Questions 5

What issue must be present on the project site to achieve Location and Transportation Credit, High-Priority Site, Option 3. Brownfield Remediation?

Options:

A.  

Mercury containing lamps

B.  

Contaminated soil or groundwater

C.  

Asphalt construction waste

D.  

Asbestos tile and glue

Discussion 0
Title
Questions
Posted

LEED-AP-BD+C
PDF

$42  $104.99

LEED-AP-BD+C Testing Engine

$50  $124.99

LEED-AP-BD+C PDF + Testing Engine

$66  $164.99