To help you prepare for the LEED-AP-BD+C USGBC exam, we are offering free LEED-AP-BD+C USGBC exam questions. All you need to do is sign up, provide your details, and prepare with the free LEED-AP-BD+C practice questions. Once you have done that, you will have access to the entire pool of LEED AP Building Design + Construction (LEED AP BD+C) LEED-AP-BD+C test questions which will help you better prepare for the exam. Additionally, you can also find a range of LEED AP Building Design + Construction (LEED AP BD+C) resources online to help you better understand the topics covered on the exam, such as LEED AP Building Design + Construction (LEED AP BD+C) LEED-AP-BD+C video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic USGBC LEED-AP-BD+C exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 2

A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

Options:

A.  

12,500 ft2 (1 160 m2)

B.  

15,000 ft2 (1 400 m2)

C.  

25,000 ft2 (2 300 m2)

D.  

35,000 ft2 (3 250 m2)

Discussion 0
Questions 3

Which of the following is true regarding LEED Pilot Credits?

Options:

A.  

Pilot Credits are not specific to the rating systems

B.  

Pilot Credits can be attempted in the design review stage only

C.  

A registered Pilot Credit must be replaced on the LEED project's scorecard if that pilot credit is removed from the Pilot Credit Library

D.  

Pilot Credit feedback surveys must be completed

Discussion 0
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby Sep 6, 2024
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Atlas
What are these Dumps? Would anybody please explain it to me.
Reign Aug 14, 2024
These are exam dumps for a variety of IT certifications. They have a vast collection of updated questions and answers, which are very helpful in preparing for the exams.
Georgina
I used Cramkey Dumps to prepare for my recent exam and I have to say, they were a huge help.
Corey Oct 2, 2024
Really? How did they help you? I know these are the same questions appears in exam. I will give my try. But tell me if they also help in some training?
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Oct 25, 2024
Good point. Thanks for the advice. I'll definitely keep that in mind.
Questions 4

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

Options:

A.  

$75

B.  

$150

C.  

$750

D.  

$1,500

Discussion 0
Questions 5

What requirement must be met when creating a Demand Response Program that satisfies Energy and Atmosphere Credit, Demand Response?

Options:

A.  

Permanently reduce the energy consumption in the building by 5%

B.  

Demonstrate submetering of the two highest electrical end uses

C.  

Demonstrate a load shift reduction of 5% in the building

D.  

Create a comprehensive plan for meeting a demand response event

Discussion 0
Title
Questions
Posted

LEED-AP-BD+C
PDF

$36.75  $104.99

LEED-AP-BD+C Testing Engine

$43.75  $124.99

LEED-AP-BD+C PDF + Testing Engine

$57.75  $164.99