Leadership in Energy and Environmental Design (LEED) LEED AP Building Design + Construction (LEED AP BD+C)

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update Dec 25, 2025
Total Questions : 337

To help you prepare for the LEED-AP-BD+C USGBC exam, we are offering free LEED-AP-BD+C USGBC exam questions. All you need to do is sign up, provide your details, and prepare with the free LEED-AP-BD+C practice questions. Once you have done that, you will have access to the entire pool of LEED AP Building Design + Construction (LEED AP BD+C) LEED-AP-BD+C test questions which will help you better prepare for the exam. Additionally, you can also find a range of LEED AP Building Design + Construction (LEED AP BD+C) resources online to help you better understand the topics covered on the exam, such as LEED AP Building Design + Construction (LEED AP BD+C) LEED-AP-BD+C video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic USGBC LEED-AP-BD+C exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 2

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

Options:

A.  

Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance

B.  

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.  

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.  

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Discussion 0
Questions 3

Qualifying spaces for the Sustainable Sites Credit, Places of Respite must

Options:

A.  

be located outdoors near a water feature

B.  

be located at least 20 ft. (6 m) from a smoking area

C.  

have provisions for direct medical care to be delivered in the area

D.  

have options for shade or indirect sun for a portion of seating spaces

Discussion 0
Ella-Rose
Amazing website with excellent Dumps. I passed my exam and secured excellent marks!!!
Alisha Nov 4, 2025
Extremely accurate. They constantly update their materials with the latest exam questions and answers, so you can be confident that what you're studying is up-to-date.
Cody
I used Cramkey Dumps to prepare and a lot of the questions on the exam were exactly what I found in their study materials.
Eric Nov 25, 2025
Really? That's great to hear! I used Cramkey Dumps too and I had the same experience. The questions were almost identical.
Hassan
Highly Recommended Dumps… today I passed my exam! Same questions appear. I bought Full Access.
Kasper Nov 25, 2025
Hey wonderful….so same questions , sounds good. Planning to write this week, I will go for full access today.
Elise
I've heard that Cramkey is one of the best websites for exam dumps. They have a high passing rate and the questions are always up-to-date. Is it true?
Cian Nov 6, 2025
Definitely. The dumps are constantly updated to reflect the latest changes in the certification exams. And I also appreciate how they provide explanations for the answers, so I could understand the reasoning behind each question.
Questions 4

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

Options:

A.  

No action is necessary as the PV system is not required to be commissioned

B.  

The PV system installer should commission his own installations and share the results with the project owner

C.  

The Cx agent for the project must conduct or oversee the Cx of the PV system

D.  

The building's mechanical engineer should commission his own installations and share the results with the project owner

Discussion 0
Questions 5

What issue must be present on the project site to achieve Location and Transportation Credit, High-Priority Site, Option 3. Brownfield Remediation?

Options:

A.  

Mercury containing lamps

B.  

Contaminated soil or groundwater

C.  

Asphalt construction waste

D.  

Asbestos tile and glue

Discussion 0
Title
Questions
Posted

LEED-AP-BD+C
PDF

$26.25  $104.99

LEED-AP-BD+C Testing Engine

$31.25  $124.99

LEED-AP-BD+C PDF + Testing Engine

$41.25  $164.99