Month End Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-AP-BD+C Exam Questions and Answers by aadam

Page: 23 / 25

USGBC LEED-AP-BD+C Exam Overview :

Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Exam Code: LEED-AP-BD+C Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 337 Q&A's Shared By: aadam
Question 92

A project's massing and site orientation can have a direct impact on which of the following prerequisites?

Options:

A.

Minimum Energy Performance

B.

Minimum Indoor Air Quality Performance

C.

Construction Activity Pollution Prevention

D.

Fundamental Commissioning and Verification

Discussion
Victoria
Hey, guess what? I passed the certification exam! I couldn't have done it without Cramkey Dumps.
Isabel Sep 21, 2024
Same here! I was so surprised when I saw that almost all the questions on the exam were exactly what I found in their study materials.
Carson
Yeah, definitely. I would definitely recommend Cramkey Dumps to anyone who is preparing for an exam.
Rufus Aug 20, 2024
Me too. They're a lifesaver!
Teddie
yes, I passed my exam with wonderful score, Accurate and valid dumps.
Isla-Rose Aug 18, 2024
Absolutely! The questions in the dumps were almost identical to the ones that appeared in the actual exam. I was able to answer almost all of them correctly.
Joey
I highly recommend Cramkey Dumps to anyone preparing for the certification exam. They have all the key information you need and the questions are very similar to what you'll see on the actual exam.
Dexter Aug 7, 2024
Agreed. It's definitely worth checking out if you're looking for a comprehensive and reliable study resource.
Question 93

Major renovation projects must meet which of the following minimum percentage savings when taking credit for renewable energy systems?

Options:

A.

5%

B.

3%

C.

2%

D.

8%

Discussion
Question 94

What requirements are needed to earn Regional Priority credits?

Options:

A.

Full name and specialty credential of LEED AP

B.

Points are awarded automatically

C.

Exemplary performance

D.

Related credits registration

Discussion
Question 95

A design team is working on a new building project and is employing an integrated, whole-building approach. The architects want to increase the size of a glazed opening on the south facing wall. Which team members are first

affected by this change?

Options:

A.

Civil engineers

B.

Facility managers

C.

Landscape architects

D.

Mechanical engineers

Discussion
Page: 23 / 25
Title
Questions
Posted

LEED-AP-BD+C
PDF

$36.75  $104.99

LEED-AP-BD+C Testing Engine

$43.75  $124.99

LEED-AP-BD+C PDF + Testing Engine

$57.75  $164.99