Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

USGBC Updated LEED-AP-BD+C Exam Questions and Answers by tiago

Page: 17 / 25

USGBC LEED-AP-BD+C Exam Overview :

Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Exam Code: LEED-AP-BD+C Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 337 Q&A's Shared By: tiago
Question 68

What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

Options:

A.

Healthcare

B.

Schools

C.

Data centers

D.

Hospitality

Discussion
Question 69

Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.

Supply air velocity

B.

Number of occupants

C.

System ventilation efficiency

D.

Supply air temperature set point

Discussion
Carson
Yeah, definitely. I would definitely recommend Cramkey Dumps to anyone who is preparing for an exam.
Rufus Sep 9, 2025
Me too. They're a lifesaver!
Alessia
Amazing Dumps. Found almost all questions in actual exam whih I prepared from these valuable dumps. Recommended!!!!
Belle Sep 18, 2025
That's impressive. I've been struggling with finding good study material for my certification. Maybe I should give Cramkey Dumps a try.
Madeleine
Passed my exam with my dream score…. Guys do give these dumps a try. They are authentic.
Ziggy Sep 21, 2025
That's really impressive. I think I might give Cramkey Dumps a try for my next certification exam.
Amy
I passed my exam and found your dumps 100% relevant to the actual exam.
Lacey Sep 25, 2025
Yeah, definitely. I experienced the same.
Neve
Will I be able to achieve success after using these dumps?
Rohan Sep 27, 2025
Absolutely. It's a great way to increase your chances of success.
Question 70

The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.

Whole-Building Life-Cycle Assessment is a

Options:

A.

gate-to-gate assessment

B.

cradle-to-gate assessment

C.

cradle-to-grave assessment

D.

cradle-to-cradle assessment

Discussion
Question 71

What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

Office

B.

Hospital

C.

Warehouse

D.

Data Center

Discussion
Page: 17 / 25
Title
Questions
Posted

LEED-AP-BD+C
PDF

$42  $104.99

LEED-AP-BD+C Testing Engine

$50  $124.99

LEED-AP-BD+C PDF + Testing Engine

$66  $164.99