Exam Name: | LEED AP Building Design + Construction (LEED AP BD+C) | ||
Exam Code: | LEED-AP-BD+C Dumps | ||
Vendor: | USGBC | Certification: | Leadership in Energy and Environmental Design (LEED) |
Questions: | 337 Q&A's | Shared By: | neve |
A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?
A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?
The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to: