Question 20

Which strategy should be employed to improve daylighting when designing a new building?

Options:

A.

Increase the building depth

B.

Increase the number of skylights

C.

Increase the height of interior partitions

D.

Decrease the number of exterior light shelves

Discussion
Wyatt
Passed my exam… Thank you so much for your excellent Exam Dumps.
Arjun May 15, 2026
That sounds really useful. I'll definitely check it out.
Georgina
I used Cramkey Dumps to prepare for my recent exam and I have to say, they were a huge help.
Corey May 19, 2026
Really? How did they help you? I know these are the same questions appears in exam. I will give my try. But tell me if they also help in some training?
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby May 22, 2026
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni May 18, 2026
Good point. Thanks for the advice. I'll definitely keep that in mind.
Question 21

A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?

Options:

A.

Discounted rail pass availability

B.

Rail line station construction completion date

C.

Connections to transfer routes

D.

Passenger capacity

Discussion
Question 22

The current facilities requirements (CFR) and operations and maintenance plan (OMP) required for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification must include

Options:

A.

issue logs

B.

functional performance tests

C.

minimum outside air requirements

D.

installation verification (construction) checklists

Discussion
Question 23

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:

Options:

A.

All luminaires have full cutoff fixtures

B.

All luminaires are mounted at least three mounting heights from the lighting boundary

C.

All luminaires have a minimum color temperature of 3500 K

D.

All luminaires meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

Discussion
Page: 5 / 25
Title
Questions
Posted

LEED-AP-BD+C
PDF

$36.75  $104.99

LEED-AP-BD+C Testing Engine

$43.75  $124.99

LEED-AP-BD+C PDF + Testing Engine

$57.75  $164.99