Question 72

A building owner installs a building automation system (BAS) to allow programmable load control. Which of the

following credits can be pursued because of the installation?

Options:

A.

Energy and Atmosphere Credit, Demand Response

B Energy and Atmosphere Credit, Ongoing Commissioning

B.

Energy and Atmosphere Credit, Enhanced Commissioning

C.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Discussion
Ace
No problem! I highly recommend Cramkey Dumps to anyone looking to pass their certification exams. They will help you feel confident and prepared on exam day. Good luck!
Harris Jan 21, 2026
That sounds amazing. I'll definitely check them out. Thanks for the recommendation!
Victoria
Hey, guess what? I passed the certification exam! I couldn't have done it without Cramkey Dumps.
Isabel Jan 8, 2026
Same here! I was so surprised when I saw that almost all the questions on the exam were exactly what I found in their study materials.
Anaya
I found so many of the same questions on the real exam that I had already seen in the Cramkey Dumps. Thank you so much for making exam so easy for me. I passed it successfully!!!
Nina Jan 12, 2026
It's true! I felt so much more confident going into the exam because I had already seen and understood the questions.
River
Hey, I used Cramkey Dumps to prepare for my recent exam and I passed it.
Lewis Jan 16, 2026
Yeah, I used these dumps too. And I have to say, I was really impressed with the results.
Amy
I passed my exam and found your dumps 100% relevant to the actual exam.
Lacey Jan 24, 2026
Yeah, definitely. I experienced the same.
Question 73

What percentage of all energy usage is attributable to buildings?

Options:

A.

60%

B.

30%

C.

40%

D.

50%

Discussion
Question 74

The project team is working to reduce the building's total energy costs in a cold climate. Which is the best strategy for the project team to consider?

Options:

A.

Additional envelope insulation

B.

Window shades

C.

Highly reflective roof

D.

Increased cooling efficiency

Discussion
Question 75

Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.

At least 6 ft. (2 m) above the floor

B.

At least 3 ft. (1 m) away from windows

C.

Between 3 ft. and 6 ft. (1 m and 2 m) above the floor

D.

On the ceiling 3 ft. (1 m) away from adjacent walls

Discussion