USGBC LEED-AP-BD+C Exam Overview :

Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Exam Code: LEED-AP-BD+C Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 232 Q&A's Shared By: shiloh
Question 64

Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

Options:

A.

it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

B.

it is specifically exempted by ASHRAE

C.

it will be installed by the owner

D.

the lamp wattage has not been determined

Discussion
Kingsley
Do anyone guide my how these dumps would be helpful for new students like me?
Haris (not set)
Absolutely! They are highly recommended for anyone looking to pass their certification exam. The dumps are easy to understand and follow, making it easier for you to study and retain the information.
Miley
Hey, I tried Cramkey Dumps for my IT certification exam. They are really awesome and helped me pass my exam with wonderful score.
Megan (not set)
That’s great!!! I’ll definitely give it a try. Thanks!!!
Ace
No problem! I highly recommend Cramkey Dumps to anyone looking to pass their certification exams. They will help you feel confident and prepared on exam day. Good luck!
Harris (not set)
That sounds amazing. I'll definitely check them out. Thanks for the recommendation!
Mariam
Do anyone think Cramkey questions can help improve exam scores?
Katie (not set)
Absolutely! Many people have reported improved scores after using Cramkey Dumps, and there are also success stories of people passing exams on the first try. I already passed this exam. I confirmed above questions were in exam.
Question 65

What LEED Building Design and Construction project type should exclude weekend transit service from the transit service level calculations for Location and Transportation Credit, Access to Quality Transit, if the project occupants do not commute to the building during weekends?

Options:

A.

Schools

B.

Data centers

C.

Hospitality

D.

Warehouses and distribution centers

Discussion
Question 66

The current facilities requirements (CFR) and operations and maintenance plan (OMP) required for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification must include

Options:

A.

issue logs

B.

functional performance tests

C.

minimum outside air requirements

D.

installation verification (construction) checklists

Discussion
Question 67

Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

Options:

A.

Buildable land within 1/4 mi. (0.40 km) of the project boundary

B.

Public right-of-way areas within 1/4 mi. (0.40 km) of the project boundary

C.

Surface parking areas within 1/2 mi. (0.80 km) of the project boundary

D.

University campus land areas within 1/2 mi. (0.80 km) of the project boundary