Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-Green-Associate Exam Questions and Answers by alisha

Page: 7 / 20

USGBC LEED-Green-Associate Exam Overview :

Exam Name: LEED Green Associate Exam
Exam Code: LEED-Green-Associate Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 273 Q&A's Shared By: alisha
Question 28

Which permanently installed building products are addressed in the Materials and Resources Credit category calculation?

Options:

A.

Framing

B.

Elevators

C.

Process equipment

D.

Formwork for concrete

Discussion
Wyatt
Passed my exam… Thank you so much for your excellent Exam Dumps.
Arjun (not set)
That sounds really useful. I'll definitely check it out.
Anaya
I found so many of the same questions on the real exam that I had already seen in the Cramkey Dumps. Thank you so much for making exam so easy for me. I passed it successfully!!!
Nina (not set)
It's true! I felt so much more confident going into the exam because I had already seen and understood the questions.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie (not set)
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Nadia
Why these dumps are important? Can I pass my exam without these dumps?
Julian (not set)
The questions in the Cramkey dumps are explained in detail and there are also study notes and reference materials provided. This made it easier for me to understand the concepts and retain the information better.
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby (not set)
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Question 29

The cost of Commissioning (Cx) Is often repaid with

Options:

A.

advanced energy metering

B.

renewable power management

C.

recovered energy performance

D.

enhanced refrigerant management

Discussion
Question 30

According to LEED. which of the following should be considered when locating a site for a project?

Options:

A.

Political landscape

B.

Infrastructure context

C.

Economic stability

D.

Revenue generating possibilities

Discussion
Question 31

Which of the following is a source of graywater?

Options:

A.

Toilets

B.

Urinals

C.

Sprinklers

D.

Lavatory faucets

Discussion
Page: 7 / 20
Title
Questions
Posted

LEED-Green-Associate
PDF

$35  $99.99

LEED-Green-Associate Testing Engine

$42  $119.99

LEED-Green-Associate PDF + Testing Engine

$56  $159.99