Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-Green-Associate Exam Questions and Answers by evangeline

Page: 20 / 23

USGBC LEED-Green-Associate Exam Overview :

Exam Name: LEED Green Associate Exam (LEED GA)
Exam Code: LEED-Green-Associate Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 320 Q&A's Shared By: evangeline
Question 80

Which of the following is a strategy that can help projects meet on site sustainability goals during construction?

Options:

A.

Update the LEED checklist

B.

Perform a value engineering exercise

C.

Purchase Renewable Energy Certificates

D.

Implement a stormwater pollution prevention plan

Discussion
Nia
Why are these Dumps so important for students these days?
Mary Oct 9, 2024
With the constantly changing technology and advancements in the industry, it's important for students to have access to accurate and valid study material. Cramkey Dumps provide just that. They are constantly updated to reflect the latest changes and ensure that the information is up-to-date.
Addison
Want to tell everybody through this platform that I passed my exam with excellent score. All credit goes to Cramkey Exam Dumps.
Libby Aug 9, 2024
That's good to know. I might check it out for my next IT certification exam. Thanks for the info.
Kingsley
Do anyone guide my how these dumps would be helpful for new students like me?
Haris Sep 11, 2024
Absolutely! They are highly recommended for anyone looking to pass their certification exam. The dumps are easy to understand and follow, making it easier for you to study and retain the information.
Lennox
Something Special that they provide a comprehensive overview of the exam content. They cover all the important topics and concepts, so you can be confident that you are well-prepared for the test.
Aiza Oct 25, 2024
That makes sense. What makes Cramkey Dumps different from other study materials?
Question 81

Good site design benefits a project in which of the following ways?

Options:

A.

Makes occupants comfortable by providing green spaces

B.

Supports access to diverse land uses, sustainable food and services

C.

Provides access to public transportation and employment opportunities

D.

Protects endangered species and maximizes development of previously undeveloped areas

Discussion
Question 82

The general contractor for a project located in a dense urban area attempts to gain a credit in Materials and Resources. Which of the following is considered a local material?

Options:

A.

Quarry tile that is extracted 370 mi (595 km) away and manufactured in a city 1.600 mi (2 575 km) away

B.

Stone that is harvested and processed 80 mi (128.7 km) from the project site and purchased 75 mi. (121 km) away

C.

Vinyl flooring manufactured 500 mi (805 km) away but is sold at a warehouse 2 mi (3.2 km) from the project site

D.

Bamboo flooring that is harvested 2.350 mi. (3 782 km) away and manufactured 200 mi. (322 km) away from the project site

Discussion
Question 83

Which of the following strategies help improve daylighting in an office building?

Options:

A.

Provide individual occupant task lighting

B.

Work with the project glazing contractor to specify low argon windows

C.

Locate private offices toward the building core and organize cubicles at the perimeter

D.

Locate private offices toward the building perimeter and organize cubicles toward the building core

Discussion
Page: 20 / 23
Title
Questions
Posted

LEED-Green-Associate
PDF

$36.75  $104.99

LEED-Green-Associate Testing Engine

$43.75  $124.99

LEED-Green-Associate PDF + Testing Engine

$57.75  $164.99