Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

Oracle Updated 1z0-1066-23 Exam Questions and Answers by callan

Page: 2 / 7

Oracle 1z0-1066-23 Exam Overview :

Exam Name: Oracle Planning and Collaboration Cloud 2023 Implementation Professional
Exam Code: 1z0-1066-23 Dumps
Vendor: Oracle Certification: Supply Chain Planning Cloud
Questions: 109 Q&A's Shared By: callan
Question 8

Which is NOT a legitimate way to launch a plan?

Options:

A.

When editing plan options, click Save and Run.

B.

From Setup & Maintenance, in the Planning functional area, select a plan and click the Run icon.

C.

Launch via a scheduled process.

D.

From Manage Plans, select a plan in the search results, and select Run Plan from the Actions menu.

Discussion
Question 9

Your customer wants to display a numeric measure in both pound and kilogram Units of Measure (UOM) on a table. Describe the configuration steps to display a measure in two UOMs.

Options:

A.

Open a table and select Actions, View Table Configuration and click UOM tab. Select primary UOM as pound and secondary UOM as kilogram.

B.

Open a table and select View, Format Measures to find the measure. Now select pound as primary UOM and kilogram as secondary UOM.

C.

Open a table and select Actions, View Table Configuration and click Measure tab. Find the measure, duplicate the measure, and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.

D.

Open a table and select View, Format Measures to find the measure. Duplicate the measure and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.

Discussion
Question 10

Which two statements are true about the seeded (predefined) Contract Manufacturing roles? (Choose two.)

Options:

A.

Users with the Supply Chain Operations Manager role can access the Supply Chain Collaboration work area.

B.

Users with the Contract Manufacturer role can access the Supplier Portal to upload their production updates.

C.

Users with the Supplier Inventory Manager role don't need access to the Supplier Portal because they already have access to the Supply Chain Collaboration work area.

D.

Users with the Supply Chain Operations Manager role need access to the Supplier Portal to see their updates and what's in progress.

E.

Users with the Supplier Inventory Manager role can access the Supplier Portal.

Discussion
Victoria
Hey, guess what? I passed the certification exam! I couldn't have done it without Cramkey Dumps.
Isabel Sep 21, 2024
Same here! I was so surprised when I saw that almost all the questions on the exam were exactly what I found in their study materials.
Nadia
Why these dumps are important? Can I pass my exam without these dumps?
Julian Oct 22, 2024
The questions in the Cramkey dumps are explained in detail and there are also study notes and reference materials provided. This made it easier for me to understand the concepts and retain the information better.
Billy
It was like deja vu! I was confident going into the exam because I had already seen those questions before.
Vincent Aug 15, 2024
Definitely. And the best part is, I passed! I feel like all that hard work and preparation paid off. Cramkey is the best resource for all students!!!
Ella-Rose
Amazing website with excellent Dumps. I passed my exam and secured excellent marks!!!
Alisha Aug 17, 2024
Extremely accurate. They constantly update their materials with the latest exam questions and answers, so you can be confident that what you're studying is up-to-date.
Norah
Cramkey is highly recommended.
Zayan Oct 17, 2024
Definitely. If you're looking for a reliable and effective study resource, look no further than Cramkey Dumps. They're simply wonderful!
Question 11

During implementation, the customer would like to use safety stock planning parameters. However, they would like to uncheck "Safety stock change interval to all items." What will the results be if they choose to uncheck this parameter?

Options:

A.

Safety stock will not be calculated at all for this plan.

B.

This option will require a min/max quantity for this parameter even though it will not be used.

C.

Safety stock will use a smoothing method to calculate the safety stock within change interval to determine the level of safety stock needed without this parameter.

D.

Safety stock change interval will only apply to items with Days of Cover safety stock method.

Discussion
Page: 2 / 7

1z0-1066-23
PDF

$42  $104.99

1z0-1066-23 Testing Engine

$50  $124.99

1z0-1066-23 PDF + Testing Engine

$66  $164.99