Question 8

Which is NOT a legitimate way to launch a plan?

Options:

A.

When editing plan options, click Save and Run.

B.

From Setup & Maintenance, in the Planning functional area, select a plan and click the Run icon.

C.

Launch via a scheduled process.

D.

From Manage Plans, select a plan in the search results, and select Run Plan from the Actions menu.

Discussion
Lennie
I passed my exam and achieved wonderful score, I highly recommend it.
Emelia Nov 11, 2025
I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub Nov 11, 2025
That's great to hear. I am going to try them soon.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Nov 2, 2025
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Laila
They're such a great resource for anyone who wants to improve their exam results. I used these dumps and passed my exam!! Happy customer, always prefer. Yes, same questions as above I know you guys are perfect.
Keira Nov 3, 2025
100% right….And they're so affordable too. It's amazing how much value you get for the price.
Robin
Cramkey is highly recommended.
Jonah Nov 26, 2025
Definitely. If you're looking for a reliable and effective study resource, look no further than Cramkey Dumps. They're simply wonderful!
Question 9

Your customer wants to display a numeric measure in both pound and kilogram Units of Measure (UOM) on a table. Describe the configuration steps to display a measure in two UOMs.

Options:

A.

Open a table and select Actions, View Table Configuration and click UOM tab. Select primary UOM as pound and secondary UOM as kilogram.

B.

Open a table and select View, Format Measures to find the measure. Now select pound as primary UOM and kilogram as secondary UOM.

C.

Open a table and select Actions, View Table Configuration and click Measure tab. Find the measure, duplicate the measure, and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.

D.

Open a table and select View, Format Measures to find the measure. Duplicate the measure and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.

Discussion
Question 10

Which two statements are true about the seeded (predefined) Contract Manufacturing roles? (Choose two.)

Options:

A.

Users with the Supply Chain Operations Manager role can access the Supply Chain Collaboration work area.

B.

Users with the Contract Manufacturer role can access the Supplier Portal to upload their production updates.

C.

Users with the Supplier Inventory Manager role don't need access to the Supplier Portal because they already have access to the Supply Chain Collaboration work area.

D.

Users with the Supply Chain Operations Manager role need access to the Supplier Portal to see their updates and what's in progress.

E.

Users with the Supplier Inventory Manager role can access the Supplier Portal.

Discussion
Question 11

During implementation, the customer would like to use safety stock planning parameters. However, they would like to uncheck "Safety stock change interval to all items." What will the results be if they choose to uncheck this parameter?

Options:

A.

Safety stock will not be calculated at all for this plan.

B.

This option will require a min/max quantity for this parameter even though it will not be used.

C.

Safety stock will use a smoothing method to calculate the safety stock within change interval to determine the level of safety stock needed without this parameter.

D.

Safety stock change interval will only apply to items with Days of Cover safety stock method.