| Exam Name: | HCIP-Datacom-Advanced Routing & Switching Technology V1.0 | ||
| Exam Code: | H12-831_V1.0 Dumps | ||
| Vendor: | Huawei | Certification: | HCIP-Datacom |
| Questions: | 244 Q&A's | Shared By: | hadi |
On the IS-IS IPv6 network shown in the figure, if you check the LSDB on R1, the command output shows that R1 is the DIS.

If technology migration on the network affects the services running on the live network, strictly follow the preset operation process and risk control measures during the implementation of the technology migration project. Generally, this type of project is defined as a migration project. Which of the following operations performed on the live network belongs to a non-migration project?
If end-to-end QoS is configured on an MPLS network, the penultimate hop device on the MPLS network can pop MPLS labels from packets based on penultimate hop popping (PHP), so that the egress node can process packets based on the QoS priority in inner packets.
When a fault occurs on an OSPF network, traffic can be switched to another path only after several phases. Sort these phases in the correct sequence.
