Question 92

Analyzing the strengths, weaknesses, opportunities, and threats (SWOT) of a project is known as:

Options:

A.

calculating cost of quality

B.

comparing project benefits

C.

performing measurements analysis

D.

identifying risks

Discussion
Question 93

The CPI is .92, and the EV is US$172,500. What is the actual cost of the project?

Options:

A.

US$158,700

B.

US$172,500

C.

US$187,500

D.

US$245,600

Discussion
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline Sep 15, 2025
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Ayesha
They are study materials that are designed to help students prepare for exams and certification tests. They are basically a collection of questions and answers that are likely to appear on the test.
Ayden Sep 11, 2025
That sounds interesting. Why are they useful? Planning this week, hopefully help me. Can you give me PDF if you have ?
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Sep 16, 2025
Good point. Thanks for the advice. I'll definitely keep that in mind.
Kylo
What makes Cramkey Dumps so reliable? Please guide.
Sami Sep 23, 2025
Well, for starters, they have a team of experts who are constantly updating their material to reflect the latest changes in the industry. Plus, they have a huge database of questions and answers, which makes it easy to study and prepare for the exam.
Question 94

Which input may influence quality assurance work and should be monitored within the context of a system for configuration management?

Options:

A.

Work performance data

B.

Project documents

C.

Scope baseline

D.

Requirements documentation

Discussion
Question 95

The chart below is an example of a:

Questions 95

Options:

A.

Responsibility assignment matrix (RAM)

B.

Work breakdown structure (WBS)

C.

RACI chart

D.

Requirements traceability matrix

Discussion
Page: 23 / 34
Title
Questions
Posted

PMI-001
PDF

$42  $104.99

PMI-001 Testing Engine

$50  $124.99

PMI-001 PDF + Testing Engine

$66  $164.99