Question 92

Analyzing the strengths, weaknesses, opportunities, and threats (SWOT) of a project is known as:

Options:

A.

calculating cost of quality

B.

comparing project benefits

C.

performing measurements analysis

D.

identifying risks

Discussion
Question 93

The CPI is .92, and the EV is US$172,500. What is the actual cost of the project?

Options:

A.

US$158,700

B.

US$172,500

C.

US$187,500

D.

US$245,600

Discussion
Miley
Hey, I tried Cramkey Dumps for my IT certification exam. They are really awesome and helped me pass my exam with wonderful score.
Megan (not set)
That’s great!!! I’ll definitely give it a try. Thanks!!!
Pippa
I was so happy to see that almost all the questions on the exam were exactly what I found in their Dumps.
Anastasia (not set)
You are right…It was amazing! The Cramkey Dumps were so comprehensive and well-organized, it made studying for the exam a breeze.
Zayaan
Successfully aced the exam… Thanks a lot for providing amazing Exam Dumps.
Harmony (not set)
That's fantastic! I'm glad to hear that their dumps helped you. I also used them and found it accurate.
Cody
I used Cramkey Dumps to prepare and a lot of the questions on the exam were exactly what I found in their study materials.
Eric (not set)
Really? That's great to hear! I used Cramkey Dumps too and I had the same experience. The questions were almost identical.
Question 94

Which input may influence quality assurance work and should be monitored within the context of a system for configuration management?

Options:

A.

Work performance data

B.

Project documents

C.

Scope baseline

D.

Requirements documentation

Discussion
Question 95

The chart below is an example of a:

Questions 95

Options:

A.

Responsibility assignment matrix (RAM)

B.

Work breakdown structure (WBS)

C.

RACI chart

D.

Requirements traceability matrix

Discussion
Page: 23 / 34
Title
Questions
Posted

PMI-001
PDF

$35  $99.99

PMI-001 Testing Engine

$42  $119.99

PMI-001 PDF + Testing Engine

$56  $159.99