Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Cisco Updated 300-610 Exam Questions and Answers by keyaan

Page: 13 / 19

Cisco 300-610 Exam Overview :

Exam Name: Designing Cisco Data Center Infrastructure (DCID)
Exam Code: 300-610 Dumps
Vendor: Cisco Certification: CCNP Data Center
Questions: 258 Q&A's Shared By: keyaan
Question 52

An engineer needs to design a network environment in a data center that uses Cisco Nexus 9000 Series Switches The solution must meet these requirements

• interoperate with 802 1D devices

• load-balance spanning-tree traffic

• interoperate with third-party devices

Which spanning-tree protocol meets these requirements?

Options:

A.

MSTP

B.

RPVST+

C.

STP

D.

RSTP

Discussion
Question 53

A network architect must design a large-scale Cisco SAN topology. The customer has a limited budget, so a design that provides use of resources is required. To support this requirement, the architect to share array ports, ISL, and line card bandwidth. The customer has also presented these additional considerations:

    The customers plans to expand the network by 10% over the next two years.

    The customer’s policy requires physically separated infrastructure to support high availability.

Which solution should be used to meet these requirements?

Options:

A.

Collapsed-core

B.

Mesh

C.

Core-edge

D.

Edge-core-edge

Discussion
Question 54

A network engineer is implementing Cisco UCS manager with Cisco UCS center integration. The company is strict security policies require that the logical profile of virtual network adapters and logical addressing assigned to Cisco UCS servers be managed by the Cisco UCS manager. The users must also be prevented from being able to acknowledge pending activities in the Cisco UCS manager. Which two profile must be used to meet these requirements? (Choose two.)

Options:

A.

Global maintenance

B.

Public network control

C.

Restricted chassis

D.

Local power

E.

Local service

Discussion
Rae
I tried using Cramkey dumps for my recent certification exam and I found them to be more accurate and up-to-date compared to other dumps I've seen. Passed the exam with wonderful score.
Rayyan Sep 14, 2024
I see your point. Thanks for sharing your thoughts. I might give it a try for my next certification exam.
Fatima
Hey I passed my exam. The world needs to know about it. I have never seen real exam questions on any other exam preparation resource like I saw on Cramkey Dumps.
Niamh Oct 15, 2024
That's true. Cramkey Dumps are simply the best when it comes to preparing for the certification exam. They have all the key information you need and the questions are very similar to what you'll see on the actual exam.
Cody
I used Cramkey Dumps to prepare and a lot of the questions on the exam were exactly what I found in their study materials.
Eric Sep 13, 2024
Really? That's great to hear! I used Cramkey Dumps too and I had the same experience. The questions were almost identical.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Oct 29, 2024
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Oct 25, 2024
Good point. Thanks for the advice. I'll definitely keep that in mind.
Question 55

A cloud service provider provisioned four active/active data centers in various locations within the country at 50 miles between each data center. The data centers must provide redundant network infrastructure and always be available to customers.

Which two data center design steps must be used to meet these requirements? (Choose two.)

Options:

A.

Provide application hosting services to customers from the closest data center.

B.

Implement active cluster in data centers 1 and 2 and backup in 3 and 4.

C.

Use asynchronous replication between data centers 1 and 2.

D.

Deploy database services in data center 1 and application layer to other data centers.

E.

Configure application data replication to all backup data centers.

Discussion
Page: 13 / 19
Title
Questions
Posted

300-610
PDF

$40.25  $114.99

300-610 Testing Engine

$47.25  $134.99

300-610 PDF + Testing Engine

$61.25  $174.99