Month End Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cram70off

Cisco Updated 300-610 Exam Questions and Answers by arnie

Page: 14 / 19

Cisco 300-610 Exam Overview :

Exam Name: Designing Cisco Data Center Infrastructure for Traditional and AI Workloads
Exam Code: 300-610 Dumps
Vendor: Cisco Certification: CCNP Data Center
Questions: 277 Q&A's Shared By: arnie
Question 56

What is the disadvantage of asynchronous storage replication as compared to synchronous storage replication in a disaster recovery design?

Options:

A.

reduction in application performance

B.

distance limitations

C.

specific backup requirements

D.

potential data loss

Discussion
Ella-Rose
Amazing website with excellent Dumps. I passed my exam and secured excellent marks!!!
Alisha Dec 15, 2025
Extremely accurate. They constantly update their materials with the latest exam questions and answers, so you can be confident that what you're studying is up-to-date.
Rosalie
I passed. I would like to tell all students that they should definitely give Cramkey Dumps a try.
Maja Dec 5, 2025
That sounds great. I'll definitely check them out. Thanks for the suggestion!
Ayra
How these dumps are necessary for passing the certification exam?
Damian Dec 4, 2025
They give you a competitive edge and help you prepare better.
Syeda
I passed, Thank you Cramkey for your precious Dumps.
Stella Dec 28, 2025
That's great. I think I'll give Cramkey Dumps a try.
Question 57

An engineer must interconnect two data centers to support the dynamic virtual machine migration. The data centers are currently interconnected using an IPv4 network. However, the data piano encapsulation of the underlay network is expected to change next year. To meet the VM migration requirement, the solution must track MAC route changes, update all other remote devices simultaneously and prevent excessive MAC flapping with broadcast and unicast traffic loops. The company must also use networking equipment from different manufacturers to prevent vendor-locking. Which solution meets these requirements?

Options:

A.

EoMPLS

B.

EVPN

C.

OTV

D.

VXLAN

Discussion
Question 58

An engineer must design a Cisco HyperFlex solution to support a virtualized environment in a single data center location. The design must consider these customer requirements:

    a large-scale cluster with eight or more nodes

    distributed high-performance file system for virtualized servers

    high fault tolerance to multiple node failures

Which action meets these objectives?

Options:

A.

Configure data destaging and deduplication

B.

Implement a replication factor of four.

C.

Enable logical availability zones.

D.

Create multiple datastores for storage of VM.

Discussion
Question 59

A customer requires a tool to manage Cisco network hardware. The solution must use secure communication using a secure network protocol, support the use of declarative language to manage the state of resources, and periodically pull changes to the controlled nodes. Which tool meets these requirements?

Options:

A.

Ansible

B.

SaltStack

C.

Puppet

D.

Nomir

Discussion
Page: 14 / 19
Title
Questions
Posted

300-610
PDF

$34.5  $114.99

300-610 Testing Engine

$40.5  $134.99

300-610 PDF + Testing Engine

$52.5  $174.99