| Exam Name: | Designing Cisco Data Center Infrastructure for Traditional and AI Workloads v1.2 (DCID 300-610) | ||
| Exam Code: | 300-610 Dumps | ||
| Vendor: | Cisco | Certification: | CCNP Data Center |
| Questions: | 299 Q&A's | Shared By: | arnie |
A Cisco engineer is analyzing a customer environment where dozens of VMs are running on a physical server and UCS chassis are cascaded The setup uses two ISLs in a port channel to the SAN switch (per fabric) The oversubscription from VM to physical SAN port is often 20 (VMs/host) x 72 (9 UCS chassis cascaded = 72 hosts): 2 (ISLs from fabric interconnect to SAN switch port on the NPV core (NPIV enabled switch) This results to 20 x 72 2 per single ISL = 720 VMs per ISL
20 (VMs per host) x 8 (hosts per chassis) x 9 (chassis per port channel to SAN switch) / 2 (ISLs per port channel) = 20 x 8 x 9 / 2 = 720 VMs per SAN F-port What is the best way to resolve possible IOPS bottleneck?
Which factor determines the choice of platform designing a Cisco HyperFlex infrastructure to support computer-aided design applications?
An AI/ML team is designing a fraud-detection model for an online banking application. The platform must process a high volume of transaction data, retrain the model frequently, and perform inference in real time as transactions occur. The data center must provide low-latency connectivity between compute resources and scale as the data volume grows. Which compute solution is most appropriate?
Refer to the exhibit.

What must be the default gateway of the servers in EPG Web?