Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Cisco Updated 300-610 Exam Questions and Answers by tiana

Page: 6 / 22

Cisco 300-610 Exam Overview :

Exam Name: Designing Cisco Data Center Infrastructure for Traditional and AI Workloads v1.2 (DCID 300-610)
Exam Code: 300-610 Dumps
Vendor: Cisco Certification: CCNP Data Center
Questions: 299 Q&A's Shared By: tiana
Question 24

A cloud service provider provisioned four active/active data centers in various locations within the country at 50 miles between each data center. The data centers must provide redundant network infrastructure and always be available to customers.

Which two data center design steps must be used to meet these requirements? (Choose two.)

Options:

A.

Provide application hosting services to customers from the closest data center.

B.

Implement active cluster in data centers 1 and 2 and backup in 3 and 4.

C.

Use asynchronous replication between data centers 1 and 2.

D.

Deploy database services in data center 1 and application layer to other data centers.

E.

Configure application data replication to all backup data centers.

Discussion
Question 25

A network engineer must perform a VMM integration for the VMWare vCenter platform with the Cisco ACI Fabric. The vCenter is already installed in one of the rack servers connected to ACI leaf switches in a vPC mode. Which type of management network must be used to integrate vCenter with ACI?

Options:

A.

ARC infra

B.

VLAN infra

C.

out-of-band management

D.

In-band management

Discussion
Question 26

Refer to the exhibit.

Questions 26

Which template is used when a vHBA template pair is created for a specific server that inherits its attributes from an existing template?

Options:

A.

Secondary

B.

Initial

C.

Updating

D.

Primary

Discussion
Question 27

An AI/ML team is designing a fraud-detection model for an online banking application. The platform must process a high volume of transaction data, retrain the model frequently, and perform inference in real time as transactions occur. The data center must provide low-latency connectivity between compute resources and scale as the data volume grows. Which compute solution is most appropriate?

Options:

A.

CPU-based compute instances with local SSD storage

B.

GPU-based compute instances connected through high-throughput networking

C.

Cloud-based compute resources with dynamic elastic scaling

D.

Dedicated multicore CPUs with distributed storage

Discussion
Syeda
I passed, Thank you Cramkey for your precious Dumps.
Stella Jul 14, 2026
That's great. I think I'll give Cramkey Dumps a try.
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby Jul 9, 2026
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Addison
Want to tell everybody through this platform that I passed my exam with excellent score. All credit goes to Cramkey Exam Dumps.
Libby Jul 2, 2026
That's good to know. I might check it out for my next IT certification exam. Thanks for the info.
Atlas
What are these Dumps? Would anybody please explain it to me.
Reign Jul 28, 2026
These are exam dumps for a variety of IT certifications. They have a vast collection of updated questions and answers, which are very helpful in preparing for the exams.
Lennox
Something Special that they provide a comprehensive overview of the exam content. They cover all the important topics and concepts, so you can be confident that you are well-prepared for the test.
Aiza Jul 5, 2026
That makes sense. What makes Cramkey Dumps different from other study materials?
Page: 6 / 22
Title
Questions
Posted

300-610
PDF

$40.25  $114.99

300-610 Testing Engine

$47.25  $134.99

300-610 PDF + Testing Engine

$61.25  $174.99