Big Black Friday Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Cisco Updated 300-420 Exam Questions and Answers by niya

Page: 5 / 25

Cisco 300-420 Exam Overview :

Exam Name: Designing Cisco Enterprise Networks (ENSLD)
Exam Code: 300-420 Dumps
Vendor: Cisco Certification: CCNP Enterprise
Questions: 339 Q&A's Shared By: niya
Question 20

An engineer must design a large Layer 2 domain that contains hundreds of switches and VLANs. The engineer's primary goals are to:

•Efficiently utilize the bandwidth of all links

•Avoid Layer 2 loops

•Cause minimal impact on switch CPU and memory

Which technology should the engineer include in the design?

Options:

A.

PVST+

B.

Rapid PVST+

C.

MST

D.

RSTP

Discussion
Ella-Rose
Amazing website with excellent Dumps. I passed my exam and secured excellent marks!!!
Alisha Oct 2, 2025
Extremely accurate. They constantly update their materials with the latest exam questions and answers, so you can be confident that what you're studying is up-to-date.
Nell
Are these dumps reliable?
Ernie Oct 21, 2025
Yes, very much so. Cramkey Dumps are created by experienced and certified professionals who have gone through the exams themselves. They understand the importance of providing accurate and relevant information to help you succeed.
Lennox
Something Special that they provide a comprehensive overview of the exam content. They cover all the important topics and concepts, so you can be confident that you are well-prepared for the test.
Aiza Oct 12, 2025
That makes sense. What makes Cramkey Dumps different from other study materials?
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby Oct 17, 2025
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Question 21

Questions 21

Refer to the exhibit A customer requires maximum uptime for the data plane between R1 and R3 running OSPF Which solution must the design include for high availability if the routing process on R2 requires maintenance?

Options:

A.

BFD on all routers

B.

nonstop forwarding on R1 and R3

C.

nonstop forwarding on R3 only

D.

graceful restart on all routers

Discussion
Question 22

An existing network solution is using BFD in echo mode. Several of the network devices are experiencing high CPU utilization which an engineer has determined is related to the BFD feature. Which solution should the engineer leverage to reduce the CPU load?

Options:

A.

Implement slow timers between peers with low CPU resources.

B.

Implement BED asynchronous mode between peers with low CPU resources.

C.

Enable BFD multi-hop on the devices with low CPU resources.

D.

Utilize carrier delay on all routers in the network.

Discussion
Question 23

Questions 23

Refer to the exhibit. An engineer Is designing a multicampus Layer 3 Infrastructure using EIGRP as the routing protocol. The design must provide quick replies to queries In the event of a downlink, prevent unnecessary queries, and ensure that traffic does not unnecessarily transit the access layer. Which two actions must the engineer take for the network design? (Choose two.)

Options:

A.

Configure core layer switches as stub routers.

B.

Configure distribution layer switches to summarize routes to the core layer.

C.

Configure access layer switches as stub routers.

D.

Configure access layer and core layer switches as stub routers.

E.

Configure access layer switches to summarize routes to the distribution layer.

Discussion
Page: 5 / 25
Title
Questions
Posted

300-420
PDF

$40.25  $114.99

300-420 Testing Engine

$47.25  $134.99

300-420 PDF + Testing Engine

$61.25  $174.99