Question 12

A data center provider has designed a network using these requirements

 Two data center sites are connected to the public internet

 Both data centers are connected to different Internet providers

 Both data centers are also directly connected with a private connection for the internal traffic can also be at this direct connection The data center provider has only /19 public IP address block

Under normal conditions, Internet traffic should be routed directly to the data center where the services are located. When one Internet connections fails to complete traffic for both data centers should be routed by using the remaining Internet connection in which two ways can this routing be achieved? (Choose two)

Options:

A.

One /20 block is used for the first data center and the second /20 block is used for the second data center. The /20 block from the local data center is sent out without path prepending and the /20 block from the remote data center is sent out with path prepending at both sites

B.

One /20 block is used for the first data center and the second /20 block is used for the second data center. Each /20 block is only sent out locally. The /19 block is sent out at both Internet connections for the backup case to reroute the traffic through the remaining internet connection

C.

One /20 block is used for the first data center and the second /20 block is used for the second data center. The /20 block from the local data center is sent out with a low BGP local preference and the /20 block from the remote data center is sent out with a higher BGP local preference of both sites

D.

BGP will always load-balance the traffic to both data center sites

E.

One /20 block is used for the first data center and the second /20 block is used for the second data center. The /20 block from the local data center is sent out with a low BGP weight and the /20 block from the remote data center is sent out with a higher BGP weight at both sites

F.

The data center provider must have an additional public IP address block for this routing

Discussion
Question 13

When is it required to leak routes into an IS-IS Level 1 area?

Options:

A.

when equal cost load balancing is required between the backbone and non-backbone areas

B.

when unequal cost load balancing is required between the backbone and non-backbone areas

C.

when MPLS L3VPN PE devices are configured in the Level 1 areas

D.

when a multicast RP is configured in the non-backbone area

Discussion
Question 14

Which two foundational aspects of loT are still evolving and being worked on by the industry at large? (Choose two)

Options:

A.

Regulatory domains

B.

loT consortia

C.

Standards

D.

Low energy Bluetooth sensors

E.

WiFi protocols

Discussion
Ari
Can anyone explain what are these exam dumps and how are they?
Ocean Oct 17, 2025
They're exam preparation materials that are designed to help you prepare for various certification exams. They provide you with up-to-date and accurate information to help you pass your exams.
Vienna
I highly recommend them. They are offering exact questions that we need to prepare our exam.
Jensen Oct 11, 2025
That's great. I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Ella-Rose
Amazing website with excellent Dumps. I passed my exam and secured excellent marks!!!
Alisha Oct 2, 2025
Extremely accurate. They constantly update their materials with the latest exam questions and answers, so you can be confident that what you're studying is up-to-date.
Addison
Want to tell everybody through this platform that I passed my exam with excellent score. All credit goes to Cramkey Exam Dumps.
Libby Oct 3, 2025
That's good to know. I might check it out for my next IT certification exam. Thanks for the info.
Question 15

Your client is considering acquiring a new IPv6 address block so that all Ethernet interfaces on the network receive addresses based on their burned-in hardware addresses, with support for 600 VLANs. Which action do you recommend?

Options:

A.

Acquire a new /60 IPv6 network and subnet it into /70 networks, one per VLAN

B.

Acquire a new /58 IPv6 network and subnet it into /64 networks, one per VLAN

C.

Acquire a new /60 Ipv6 network and subnet it into /68 networks, one per VLAN

D.

Acquire a new/54 IPv6 network and subnet it into /64 networks , one per VLAN