Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

WELL Updated WELL-AP Exam Questions and Answers by ayeza

Page: 3 / 15

WELL WELL-AP Exam Overview :

Exam Name: WELL Accredited Professional (WELL AP) Exam
Exam Code: WELL-AP Dumps
Vendor: WELL Certification: WELL Accredited Professional
Questions: 204 Q&A's Shared By: ayeza
Question 12

Please click on the Project Scenario B button to review the project scenario and answer the following question.

BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.

The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.

The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.

Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.

Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.

PROJECT SCOPE & GOALS

Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.

As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.

The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.

Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.

By installing digital displays that promote the consumption of fruits, vegetables and water in the dedicated eating areas, which of the following features could the project team attempt?

Options:

A.

Feature N08: Mindful Eating

B.

Feature N04: Food Advertising

C.

Feature N07: Nutrition Education

D.

Feature N12: Local Food Production

Discussion
Question 13

A project's site previously housed a fuel station and an automotive repair shop. Which strategy should the WELL AP recommend?

Options:

A.

Hire an experienced professional to perform an environmental site assessment

B.

Engage the local community to create a strategic approach about historical use of the site

C.

Inspect the site to see if any evidence of the fuel station or automotive repair shop remains

D.

Determine if the site is a recognized Brownfield or has a similar designation from the relevant authority

Discussion
Question 14

A project team has completed the stakeholder charrette and created a plan detailing the project's health-oriented mission prior to construction. What must the team do upon project completion for Feature C02: Integrative Design?

Options:

A.

Execute a biophilia plan

B.

Prepare a post-occupancy survey

C.

Ensure the adaptable spaces are operating

D.

Make WELL building tours available to all stakeholders

Discussion
Question 15

In addition to addressing a variety of emergency situations, what else must a project address in Feature C03: Emergency Preparedness?

Options:

A.

Business continuity plan

B.

Opioid response training

C.

Employee assistance fund

D.

Annual inventory of response resources

Discussion
Ella-Rose
Amazing website with excellent Dumps. I passed my exam and secured excellent marks!!!
Alisha (not set)
Extremely accurate. They constantly update their materials with the latest exam questions and answers, so you can be confident that what you're studying is up-to-date.
Syeda
I passed, Thank you Cramkey for your precious Dumps.
Stella (not set)
That's great. I think I'll give Cramkey Dumps a try.
Fatima
Hey I passed my exam. The world needs to know about it. I have never seen real exam questions on any other exam preparation resource like I saw on Cramkey Dumps.
Niamh (not set)
That's true. Cramkey Dumps are simply the best when it comes to preparing for the certification exam. They have all the key information you need and the questions are very similar to what you'll see on the actual exam.
Mylo
Excellent dumps with authentic information… I passed my exam with brilliant score.
Dominik (not set)
That's amazing! I've been looking for good study material that will help me prepare for my upcoming certification exam. Now, I will try it.
River
Hey, I used Cramkey Dumps to prepare for my recent exam and I passed it.
Lewis (not set)
Yeah, I used these dumps too. And I have to say, I was really impressed with the results.
Page: 3 / 15

WELL-AP
PDF

$35  $99.99

WELL-AP Testing Engine

$42  $119.99

WELL-AP PDF + Testing Engine

$56  $159.99