Question 52

Please click on the Project Scenario B button to review the project scenario and answer the following question.

BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.

The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.

The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.

Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.

Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.

PROJECT SCOPE & GOALS

Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.

As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.

The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.

Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.

Although the current MERV 11 filters in the return air ducts contribute toward compliance with Feature A04:

Construction Pollution Management, the installation of MERV 14 filters could help to achieve which additional feature?

Options:

A.

Feature A12: Air Filtration

B.

Feature A13: Enhanced Supply Air

C.

Feature A06: Enhanced Ventilation Design

D.

Feature A09: Pollution Infiltration Management

Discussion
Question 53

Studies indicate that the use of antibiotics in livestock and pesticides in agricultural crops contributes to which of the following conditions in people who consume associated food products?

Options:

A.

Metabolic syndrome

B.

Higher body mass index (BMI)

C.

Adverse reproductive consequences

D.

Increased tendency for substance abuse

Discussion
Alaia
These Dumps are amazing! I used them to study for my recent exam and I passed with flying colors. The information in the dumps is so valid and up-to-date. Thanks a lot!!!
Zofia Jul 5, 2025
That's great to hear! I've been struggling to find good study material for my exam. I will ty it for sure.
Mariam
Do anyone think Cramkey questions can help improve exam scores?
Katie Jul 6, 2025
Absolutely! Many people have reported improved scores after using Cramkey Dumps, and there are also success stories of people passing exams on the first try. I already passed this exam. I confirmed above questions were in exam.
Nadia
Why these dumps are important? Can I pass my exam without these dumps?
Julian Jul 6, 2025
The questions in the Cramkey dumps are explained in detail and there are also study notes and reference materials provided. This made it easier for me to understand the concepts and retain the information better.
Elise
I've heard that Cramkey is one of the best websites for exam dumps. They have a high passing rate and the questions are always up-to-date. Is it true?
Cian Jul 3, 2025
Definitely. The dumps are constantly updated to reflect the latest changes in the certification exams. And I also appreciate how they provide explanations for the answers, so I could understand the reasoning behind each question.
Madeleine
Passed my exam with my dream score…. Guys do give these dumps a try. They are authentic.
Ziggy Jul 9, 2025
That's really impressive. I think I might give Cramkey Dumps a try for my next certification exam.
Question 54

A WELL AP is reviewing a client's waste management plan for Feature X09: Waste Management. Which key requirement must be confirmed?

Options:

A.

Recycling containers are paired with waste receptacles

B.

Food waste is collected for on-site or off-site composting

C.

Protocols for managing and minimizing hazardous waste are included

D.

Cardboard, glass, paper, plastic and metals are collected for recycling

Discussion
Question 55

Which of the following layouts would meet the requirements to provide enough exposure to meet the precondition in Light?

Options:

A.

Layout with 20% of the regularly occupied area within a 15 ft. (4.5 m) horizontal distance of envelope glazing in each floor and/or in each individual unit

B.

Layout with 25% of the regularly occupied area within a 30 ft. (9 m) horizontal distance of envelope glazing in each floor and/or in each individual unit

C.

Layout with 40% of the regularly occupied area within a 15 ft. (4.5 m) horizontal distance of envelope glazing in each floor and/or in each individual unit

D.

Layout with 50% of the regularly occupied area within a 30 ft. (9 m) horizontal distance of envelope glazing in each floor and/or in each individual unit