Question 32

A company is moving is 1, 500 employees into a new office building, which has lust passed documentation review. The building contractor has handed over the project. And the certificate of occupancy was granted two months ago Currently, 650 employees occupy the building. Which of the following steps should the WELL AP advise the project team to take next?

Options:

A.

Perform a post occupancy survey

B.

Conduct an internal performance verification

C.

Wait until 50% occupancy for performance verification

D.

Proceed with performance verification at 45% occupancy

Discussion
Victoria
Hey, guess what? I passed the certification exam! I couldn't have done it without Cramkey Dumps.
Isabel Dec 28, 2025
Same here! I was so surprised when I saw that almost all the questions on the exam were exactly what I found in their study materials.
Carson
Yeah, definitely. I would definitely recommend Cramkey Dumps to anyone who is preparing for an exam.
Rufus Dec 16, 2025
Me too. They're a lifesaver!
Nell
Are these dumps reliable?
Ernie Dec 16, 2025
Yes, very much so. Cramkey Dumps are created by experienced and certified professionals who have gone through the exams themselves. They understand the importance of providing accurate and relevant information to help you succeed.
Teddie
yes, I passed my exam with wonderful score, Accurate and valid dumps.
Isla-Rose Dec 3, 2025
Absolutely! The questions in the dumps were almost identical to the ones that appeared in the actual exam. I was able to answer almost all of them correctly.
Question 33

A project registered under WELL Core Certification has a total area of 100.000 ft3 (9 290 m2). What is the minimum of the total building floor area that should be available tor performance testing?

A)

Questions 33

B)

Questions 33

C)

Questions 33

D)

Questions 33

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Discussion
Question 34

Which of the following references could be used for Feature L02: Visual Lighting Design, Part 1: Provide Visual Acuity?

Options:

A.

ISO 8995-1:2002

B.

AS 1668.4-2012

C.

ANSI S3.1-2018

D.

2019 CARB SCM

Discussion
Question 35

Under which of the following circumstances must projects provide a plan for reprogramming or mitigating sound transmission'?

Options:

A.

A quiet zone directly border a loud zone

B.

A mixed zone directly borders a quiet zone

C.

A loud zone directly borders o mixed zone

D.

A circulation zone directly borders a mixed zone