New Year Special 75% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 75brite

WELL Updated WELL-AP Exam Questions and Answers by adelaide

Page: 6 / 15

WELL WELL-AP Exam Overview :

Exam Name: WELL Accredited Professional (WELL AP) Exam
Exam Code: WELL-AP Dumps
Vendor: WELL Certification: WELL Accredited Professional
Questions: 204 Q&A's Shared By: adelaide
Question 24

For an office building with 1,500 regular occupants and 500 occasional visitors per day, which of the following facilities meets the requirements established in Feature V04: Facilities for Active Occupants?

Options:

A.

Seven showers with changing facilities and 45 lockers are available in the building

B.

Nine showers with changing facilities and 40 lockers are available in the building

C.

10 showers with changing facilities and 50 lockers are available within 500 ft. (150 m) walking distance of the project boundary

D.

12 showers with changing facilities and 50 lockers are available within 700 ft. (225 m) walking distance of the project boundary

Discussion
Zayaan
Successfully aced the exam… Thanks a lot for providing amazing Exam Dumps.
Harmony Dec 15, 2025
That's fantastic! I'm glad to hear that their dumps helped you. I also used them and found it accurate.
Ilyas
Definitely. I felt much more confident and prepared because of the Cramkey Dumps. I was able to answer most of the questions with ease and I think that helped me to score well on the exam.
Saoirse Dec 20, 2025
That's amazing. I'm glad you found something that worked for you. Maybe I should try them out for my next exam.
River
Hey, I used Cramkey Dumps to prepare for my recent exam and I passed it.
Lewis Dec 22, 2025
Yeah, I used these dumps too. And I have to say, I was really impressed with the results.
Nadia
Why these dumps are important? Can I pass my exam without these dumps?
Julian Dec 27, 2025
The questions in the Cramkey dumps are explained in detail and there are also study notes and reference materials provided. This made it easier for me to understand the concepts and retain the information better.
Question 25

A design for a WELL building has an entryway system composed of grilles that measure the width of the entrance and 10 ft. (3 m) long in the primary direction of travel. This design can meet healthy entryways by

Options:

A.

including healthy signage at the entrance

B.

incorporating revolving doors at the entrance

C.

including effective mechanical ventilation at the entrance

D.

separating common outdoor areas from building entrances

Discussion
Question 26

Which of the following describes the purpose of an alternative adherence path (AAP)?

Options:

A.

To provide a different solution to meet a feature intent

B.

To enable substitution of a precondition for an optimisation

C.

To apply for a change of points threshold for a certification level

D.

To increase the maximum allowable points available for a given feature

Discussion
Question 27

The design for a WELL budding has restricted volatile organic compounds (VOCs) emissions (or carpeting and resilient flooring that covers over 90% of the surface area. To achieve Feature X06 VOC Restrictions, which of the following standards must the carpeting and resilient flooring comply with?

Options:

A.

Cradle to Cradle

B.

RoHS Restrictions

C.

Health Product Declaration (HPD)

D.

California Department of Health (CDPHJ Standard Method v1.2

Discussion
Page: 6 / 15

WELL-AP
PDF

$26.25  $104.99

WELL-AP Testing Engine

$31.25  $124.99

WELL-AP PDF + Testing Engine

$41.25  $164.99