Question 24

For an office building with 1,500 regular occupants and 500 occasional visitors per day, which of the following facilities meets the requirements established in Feature V04: Facilities for Active Occupants?

Options:

A.

Seven showers with changing facilities and 45 lockers are available in the building

B.

Nine showers with changing facilities and 40 lockers are available in the building

C.

10 showers with changing facilities and 50 lockers are available within 500 ft. (150 m) walking distance of the project boundary

D.

12 showers with changing facilities and 50 lockers are available within 700 ft. (225 m) walking distance of the project boundary

Discussion
Rae
I tried using Cramkey dumps for my recent certification exam and I found them to be more accurate and up-to-date compared to other dumps I've seen. Passed the exam with wonderful score.
Rayyan Mar 14, 2026
I see your point. Thanks for sharing your thoughts. I might give it a try for my next certification exam.
Freddy
I passed my exam with flying colors and I'm confident who will try it surely ace the exam.
Aleksander Mar 13, 2026
Thanks for the recommendation! I'll check it out.
Amy
I passed my exam and found your dumps 100% relevant to the actual exam.
Lacey Mar 14, 2026
Yeah, definitely. I experienced the same.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Mar 28, 2026
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Question 25

A design for a WELL building has an entryway system composed of grilles that measure the width of the entrance and 10 ft. (3 m) long in the primary direction of travel. This design can meet healthy entryways by

Options:

A.

including healthy signage at the entrance

B.

incorporating revolving doors at the entrance

C.

including effective mechanical ventilation at the entrance

D.

separating common outdoor areas from building entrances

Discussion
Question 26

Which of the following describes the purpose of an alternative adherence path (AAP)?

Options:

A.

To provide a different solution to meet a feature intent

B.

To enable substitution of a precondition for an optimisation

C.

To apply for a change of points threshold for a certification level

D.

To increase the maximum allowable points available for a given feature

Discussion
Question 27

The design for a WELL budding has restricted volatile organic compounds (VOCs) emissions (or carpeting and resilient flooring that covers over 90% of the surface area. To achieve Feature X06 VOC Restrictions, which of the following standards must the carpeting and resilient flooring comply with?

Options:

A.

Cradle to Cradle

B.

RoHS Restrictions

C.

Health Product Declaration (HPD)

D.

California Department of Health (CDPHJ Standard Method v1.2

Discussion
Page: 6 / 15

WELL-AP
PDF

$36.75  $104.99

WELL-AP Testing Engine

$43.75  $124.99

WELL-AP PDF + Testing Engine

$57.75  $164.99