Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-AP-O+M Exam Questions and Answers by romilly

Page: 2 / 12

USGBC LEED-AP-O+M Exam Overview :

Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Exam Code: LEED-AP-O+M Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 166 Q&A's Shared By: romilly
Question 8

When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

Options:

A.

Measure and document waste in weight or volume

B.

Use replacement value as the metric for ongoing waste

C.

Extrapolate data from one month of the performance period

D.

Do not allow tenant waste outside the building's waste program to be included

Discussion
Question 9

What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

10% of the vacant space

B.

10% of the gross floor area

C.

10% of the project site area

D.

10% of the regularly occupied area

Discussion
Question 10

An individual tenant in a multi-tenant building is unwilling or unable to provide their purchasing data. How does this affect the overall requirement for Materials and Resources Credit, Purchasing - Ongoing?

Options:

A.

The building is not eligible for this credit

B.

The total purchases would be decreased by the tenant's pro rata square footage

C.

The tenant's purchasing is assumed to be 50% compliant toward the sustainability criteria

D.

If the tenant's space is less than 10% of the total building, their total purchases can be excluded

Discussion
Question 11

In which of the following ways can a campus project using a Group Approach comply with Water Efficiency

Prerequisite, Building-Level Water Metering?

Options:

A.

Meter water use for each building separately; meter outdoor water use for the associated grounds

B.

Meter water use for the entire campus (buildings and the associated grounds) using a single meter

C.

Meter water use for all buildings aggregately with a single meter; outdoor water use for the associated grounds

does not need to be metered

D.

Meter water use for all buildings aggregately with a single meter; meter outdoor water use for the associated

grounds

Discussion
Hassan
Highly Recommended Dumps… today I passed my exam! Same questions appear. I bought Full Access.
Kasper May 4, 2026
Hey wonderful….so same questions , sounds good. Planning to write this week, I will go for full access today.
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline May 3, 2026
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Everleigh
I must say that they are updated regularly to reflect the latest exam content, so you can be sure that you are getting the most accurate information. Plus, they are easy to use and understand, so even new students can benefit from them.
Huxley May 9, 2026
That's great to know. So, you think new students should buy these dumps?
Andrew
Are these dumps helpful?
Jeremiah May 15, 2026
Yes, Don’t worry!!! I'm confident you'll find them to be just as helpful as I did. Good luck with your exam!
Page: 2 / 12

LEED-AP-O+M
PDF

$36.75  $104.99

LEED-AP-O+M Testing Engine

$43.75  $124.99

LEED-AP-O+M PDF + Testing Engine

$57.75  $164.99