Pre-Winter Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

USGBC Updated LEED-AP-O+M Exam Questions and Answers by eleri

Page: 6 / 12

USGBC LEED-AP-O+M Exam Overview :

Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Exam Code: LEED-AP-O+M Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 166 Q&A's Shared By: eleri
Question 24

The development of a five-year plan under Sustainable Sites Credit, Site Improvement Plan contributes to the achievement of

Options:

A.

the required 100% impervious surfaces

B.

the required 3% vegetated site area

C.

Water Efficiency Credit, Cooling Tower; Sustainable Sites Credit, Joint Use of Facilities

D.

Sustainable Sites Credit, Site Management; Water Efficiency Credit, Outdoor Water Use Reduction

Discussion
Question 25

An Indoor Environmental Quality policy for facility maintenance and renovation activities under Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy must follow the recommended

Options:

A.

procedures in Indoor Environmental Quality Green Cleaning Policy, In-house Green Cleaning Policy thermal comfort strategies in American Society of Heating Refrigerating and Air Conditioning Engineers

(ASHRAE) 55-2010

B.

direct exhaust airflow measurement strategy using devices capable of measuring the exhaust airflow meeting fresh air requirements

C.

control measures of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor

D.

Environmental Quality Guidelines for Occupied Buildings Under Construction

Discussion
Question 26

A LEED AP is reviewing construction documents to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits. What aspects of each space should the LEED AP consider?

Options:

A.

Rate of outdoor air provided per person

B.

Fire ratings of installed wall and ceiling assemblies

C.

Maximum number of intended occupants standing or seated

D.

Typical duration of intended occupancy in each space per day

Discussion
Question 27

A project team has ended all their performance periods between August 1st and August 31st. When is the latest date that the project team can submit for preliminary review?

Options:

A.

September 30th

B.

October 30th

C.

November 30th

D.

December 30th

Discussion
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline (not set)
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Alaia
These Dumps are amazing! I used them to study for my recent exam and I passed with flying colors. The information in the dumps is so valid and up-to-date. Thanks a lot!!!
Zofia (not set)
That's great to hear! I've been struggling to find good study material for my exam. I will ty it for sure.
Alessia
Amazing Dumps. Found almost all questions in actual exam whih I prepared from these valuable dumps. Recommended!!!!
Belle (not set)
That's impressive. I've been struggling with finding good study material for my certification. Maybe I should give Cramkey Dumps a try.
Miriam
Highly recommended Dumps. 100% authentic and reliable. Passed my exam with wonderful score.
Milan (not set)
I see. Thanks for the information. I'll definitely keep Cramkey in mind for my next exam.
Page: 6 / 12

LEED-AP-O+M
PDF

$40  $99.99

LEED-AP-O+M Testing Engine

$48  $119.99

LEED-AP-O+M PDF + Testing Engine

$64  $159.99