Question 24

The development of a five-year plan under Sustainable Sites Credit, Site Improvement Plan contributes to the achievement of

Options:

A.

the required 100% impervious surfaces

B.

the required 3% vegetated site area

C.

Water Efficiency Credit, Cooling Tower; Sustainable Sites Credit, Joint Use of Facilities

D.

Sustainable Sites Credit, Site Management; Water Efficiency Credit, Outdoor Water Use Reduction

Discussion
Question 25

An Indoor Environmental Quality policy for facility maintenance and renovation activities under Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy must follow the recommended

Options:

A.

procedures in Indoor Environmental Quality Green Cleaning Policy, In-house Green Cleaning Policy thermal comfort strategies in American Society of Heating Refrigerating and Air Conditioning Engineers

(ASHRAE) 55-2010

B.

direct exhaust airflow measurement strategy using devices capable of measuring the exhaust airflow meeting fresh air requirements

C.

control measures of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor

D.

Environmental Quality Guidelines for Occupied Buildings Under Construction

Discussion
Question 26

A LEED AP is reviewing construction documents to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits. What aspects of each space should the LEED AP consider?

Options:

A.

Rate of outdoor air provided per person

B.

Fire ratings of installed wall and ceiling assemblies

C.

Maximum number of intended occupants standing or seated

D.

Typical duration of intended occupancy in each space per day

Discussion
Question 27

A project team has ended all their performance periods between August 1st and August 31st. When is the latest date that the project team can submit for preliminary review?

Options:

A.

September 30th

B.

October 30th

C.

November 30th

D.

December 30th

Discussion
Conor
I recently used these dumps for my exam and I must say, I was impressed with their authentic material.
Yunus (not set)
Exactly…….The information in the dumps is so authentic and up-to-date. Plus, the questions are very similar to what you'll see on the actual exam. I felt confident going into the exam because I had studied using Cramkey Dumps.
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni (not set)
Good point. Thanks for the advice. I'll definitely keep that in mind.
Inaya
Passed the exam. questions are valid. The customer support is top-notch. They were quick to respond to any questions I had and provided me with all the information I needed.
Cillian (not set)
That's a big plus. I've used other dump providers in the past and the customer support was often lacking.
Wyatt
Passed my exam… Thank you so much for your excellent Exam Dumps.
Arjun (not set)
That sounds really useful. I'll definitely check it out.
Ayra
How these dumps are necessary for passing the certification exam?
Damian (not set)
They give you a competitive edge and help you prepare better.
Page: 6 / 12

LEED-AP-O+M
PDF

$35  $99.99

LEED-AP-O+M Testing Engine

$42  $119.99

LEED-AP-O+M PDF + Testing Engine

$56  $159.99