Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-AP-O+M Exam Questions and Answers by angus

Page: 11 / 12

USGBC LEED-AP-O+M Exam Overview :

Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Exam Code: LEED-AP-O+M Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 166 Q&A's Shared By: angus
Question 44

Which of the following strategies are eligible for reducing the landscape water demand in Water Efficiency Credit, Outdoor Water Use Reduction?

Options:

A.

Mulched paths and weather sensor controls

B.

Plant species selection and irrigation efficiency

C.

Plant species selection and permeable pavement

D.

Artificial turf grass and alternative water sources

Discussion
Everleigh
I must say that they are updated regularly to reflect the latest exam content, so you can be sure that you are getting the most accurate information. Plus, they are easy to use and understand, so even new students can benefit from them.
Huxley Mar 27, 2026
That's great to know. So, you think new students should buy these dumps?
Alaia
These Dumps are amazing! I used them to study for my recent exam and I passed with flying colors. The information in the dumps is so valid and up-to-date. Thanks a lot!!!
Zofia Mar 10, 2026
That's great to hear! I've been struggling to find good study material for my exam. I will ty it for sure.
Mariam
Do anyone think Cramkey questions can help improve exam scores?
Katie Mar 10, 2026
Absolutely! Many people have reported improved scores after using Cramkey Dumps, and there are also success stories of people passing exams on the first try. I already passed this exam. I confirmed above questions were in exam.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Mar 28, 2026
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Question 45

Which of the following is a low impact development (LID) technique for rainwater management?

Options:

A.

Storm inlet

B.

Rain garden

C.

Detention basin

D.

Impervious pavement

Discussion
Question 46

An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building's energy using systems is to

Options:

A.

reduce CFC-based refrigerants in HVAC&R base building systems

B.

produce a master list of findings related to the commissioning process

C.

execute an energy audit that meets requirements of ASHRAE Level 2

D.

identify opportunities for cost-effective reduction in energy consumption

Discussion
Question 47

A building is certified in LEED EB v2.0. Upon recertification, which LEED Operations and Maintenance version should be used?

Options:

A.

LEED EB v2.0

B.

Whichever version the team designates

C.

The version that is current at the time of registration for recertification

D.

The version subsequent to the version under which the project initially certified

Discussion
Page: 11 / 12

LEED-AP-O+M
PDF

$36.75  $104.99

LEED-AP-O+M Testing Engine

$43.75  $124.99

LEED-AP-O+M PDF + Testing Engine

$57.75  $164.99