USGBC LEED-AP-O+M Exam Overview :

Exam Name: LEED AP Operations + Maintenance (LEED AP O+M v5)
Exam Code: LEED-AP-O+M Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 100 Q&A's Shared By: aleena
Question 20

Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?

Options:

A.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use

B.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use

C.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use

D.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use

Discussion
Question 21

Which of the following is an environmentally friendly technology for controlling erosion?

Options:

A.

Mulching

B.

Laying asphalt

C.

Laying tarpaulin material

D.

Spraying water to contain dust

Discussion
Question 22

Which of the following are required to comply with Energy and Atmosphere Credit, Existing Building Commissioning- Implementation?

Options:

A.

Master list of findings

B.

Measurement of ventilation systems

C.

Five-year plan for equipment modification

D.

Detailed energy use breakdown by system

Discussion
Question 23

What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

Options:

A.

Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building

B.

12 months from the date that GBCI initially certified the building

C.

Five years from the date that the project was initially registered with GBCI

D12 months from the end date of the last performance period of the initial certification

Discussion
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Sep 1, 2026
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Billy
It was like deja vu! I was confident going into the exam because I had already seen those questions before.
Vincent Sep 17, 2026
Definitely. And the best part is, I passed! I feel like all that hard work and preparation paid off. Cramkey is the best resource for all students!!!
Nia
Why are these Dumps so important for students these days?
Mary Sep 27, 2026
With the constantly changing technology and advancements in the industry, it's important for students to have access to accurate and valid study material. Cramkey Dumps provide just that. They are constantly updated to reflect the latest changes and ensure that the information is up-to-date.
Yusra
I passed my exam. Cramkey Dumps provides detailed explanations for each question and answer, so you can understand the concepts better.
Alisha Sep 11, 2026
I recently used their dumps for the certification exam I took and I have to say, I was really impressed.
Teddie
yes, I passed my exam with wonderful score, Accurate and valid dumps.
Isla-Rose Sep 25, 2026
Absolutely! The questions in the dumps were almost identical to the ones that appeared in the actual exam. I was able to answer almost all of them correctly.
Page: 5 / 12

LEED-AP-O+M
PDF

$31.5  $104.99

LEED-AP-O+M Testing Engine

$37.5  $124.99

LEED-AP-O+M PDF + Testing Engine

$49.5  $164.99