USGBC Updated LEED-AP-O+M Exam Questions and Answers by aleena

Page: 5 / 12

USGBC LEED-AP-O+M Exam Overview :

Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Exam Code: LEED-AP-O+M Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 166 Q&A's Shared By: aleena
Question 20

Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?

Options:

A.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use

B.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use

C.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use

D.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use

Discussion
Freddy
I passed my exam with flying colors and I'm confident who will try it surely ace the exam.
Aleksander Jul 15, 2026
Thanks for the recommendation! I'll check it out.
Neve
Will I be able to achieve success after using these dumps?
Rohan Jul 8, 2026
Absolutely. It's a great way to increase your chances of success.
Stefan
Thank you so much Cramkey I passed my exam today due to your highly up to date dumps.
Ocean Jul 18, 2026
Agree….Cramkey Dumps are constantly updated based on changes in the exams. They also have a team of experts who regularly review the materials to ensure their accuracy and relevance. This way, you can be sure you're studying the most up-to-date information available.
Inaaya
Are these Dumps worth buying?
Fraser Jul 13, 2026
Yes, of course, they are necessary to pass the exam. They give you an insight into the types of questions that could come up and help you prepare effectively.
Question 21

Which of the following is an environmentally friendly technology for controlling erosion?

Options:

A.

Mulching

B.

Laying asphalt

C.

Laying tarpaulin material

D.

Spraying water to contain dust

Discussion
Question 22

Which of the following are required to comply with Energy and Atmosphere Credit, Existing Building Commissioning- Implementation?

Options:

A.

Master list of findings

B.

Measurement of ventilation systems

C.

Five-year plan for equipment modification

D.

Detailed energy use breakdown by system

Discussion
Question 23

What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

Options:

A.

Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building

B.

12 months from the date that GBCI initially certified the building

C.

Five years from the date that the project was initially registered with GBCI

D12 months from the end date of the last performance period of the initial certification