To help you prepare for the LEED-AP-O+M USGBC exam, we are offering free LEED-AP-O+M USGBC exam questions. All you need to do is sign up, provide your details, and prepare with the free LEED-AP-O+M practice questions. Once you have done that, you will have access to the entire pool of LEED AP Operations + Maintenance (LEED AP O+M) LEED-AP-O+M test questions which will help you better prepare for the exam. Additionally, you can also find a range of LEED AP Operations + Maintenance (LEED AP O+M) resources online to help you better understand the topics covered on the exam, such as LEED AP Operations + Maintenance (LEED AP O+M) LEED-AP-O+M video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic USGBC LEED-AP-O+M exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 4

The development of a five-year plan under Sustainable Sites Credit, Site Improvement Plan contributes to the achievement of

Options:

A.  

the required 100% impervious surfaces

B.  

the required 3% vegetated site area

C.  

Water Efficiency Credit, Cooling Tower; Sustainable Sites Credit, Joint Use of Facilities

D.  

Sustainable Sites Credit, Site Management; Water Efficiency Credit, Outdoor Water Use Reduction

Discussion 0
Questions 5

What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

Options:

A.  

Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building

B.  

12 months from the date that GBCI initially certified the building

C.  

Five years from the date that the project was initially registered with GBCI

D12 months from the end date of the last performance period of the initial certification

Discussion 0
Questions 6

Which of the following are required to comply with Energy and Atmosphere Credit, Existing Building Commissioning- Implementation?

Options:

A.  

Master list of findings

B.  

Measurement of ventilation systems

C.  

Five-year plan for equipment modification

D.  

Detailed energy use breakdown by system

Discussion 0
Lennie
I passed my exam and achieved wonderful score, I highly recommend it.
Emelia (not set)
I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Cecilia
Yes, I passed my certification exam using Cramkey Dumps.
Helena (not set)
Great. Yes they are really effective
Alaya
Best Dumps among other dumps providers. I like it so much because of their authenticity.
Kaiden (not set)
That's great. I've used other dump providers in the past and they were often outdated or had incorrect information. This time I will try it.
Zayaan
Successfully aced the exam… Thanks a lot for providing amazing Exam Dumps.
Harmony (not set)
That's fantastic! I'm glad to hear that their dumps helped you. I also used them and found it accurate.
Questions 7

Which of the following is an environmentally friendly technology for controlling erosion?

Options:

A.  

Mulching

B.  

Laying asphalt

C.  

Laying tarpaulin material

D.  

Spraying water to contain dust

Discussion 0

LEED-AP-O+M
PDF

$35  $99.99

LEED-AP-O+M Testing Engine

$42  $119.99

LEED-AP-O+M PDF + Testing Engine

$56  $159.99