| Exam Name: | Implementing Cisco Collaboration Core Technologies (350-801 CLCOR) | ||
| Exam Code: | 350-801 Dumps | ||
| Vendor: | Cisco | Certification: | CCNP Collaboration |
| Questions: | 383 Q&A's | Shared By: | lando |
User A Calls user. The call gets connected, but the quality is bed. What are two reasons for this issue? (Choose two)
A Cisco UCM administrator sets up new route patterns to support phones in tour different locations, all with local gateways. The administrator wants to use the same route pattern for all four locations. How must the system be configured to achieve this goal?

An engineer is trying to add a new subscriber to the cluster of Cisco UCM. and the synchronization is failing. The engineer obtained the output from the publisher and noticed the error Based on the output, what is the issue?
Which two steps are required for bulk configuration transactions on the Cisco UCM database utilizing BAT? (Choose two.)