Question 20

In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.

Options:

A.

Maintenance order header

B.

Notification activity

C.

Maintenance order operation

D.

Work center

Discussion
Neve
Will I be able to achieve success after using these dumps?
Rohan Dec 16, 2025
Absolutely. It's a great way to increase your chances of success.
Pippa
I was so happy to see that almost all the questions on the exam were exactly what I found in their Dumps.
Anastasia Dec 21, 2025
You are right…It was amazing! The Cramkey Dumps were so comprehensive and well-organized, it made studying for the exam a breeze.
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Dec 10, 2025
Good point. Thanks for the advice. I'll definitely keep that in mind.
Rosalie
I passed. I would like to tell all students that they should definitely give Cramkey Dumps a try.
Maja Dec 5, 2025
That sounds great. I'll definitely check them out. Thanks for the suggestion!
Question 21

The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

Options:

A.

Open reservations can be cleared when a maintenance order operation is finally confirmed.

B.

Reservations are created only after a material availability check has been performed

C.

For the combination of order type and planner group, you can decide when reservations are created

D.

All open reservations are closed when the maintenance order is set to TECO.

Discussion
Question 22

A Task List contains two operations:

•Every 3 MON: pump inspection

•Every 24 MON. pump replacement

When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?

Options:

A.

Assign different hierarchy levels

B.

Set the lead float

C.

Create a task list hierarchy

D.

Create a cycle set sequence

Discussion
Question 23

How does a performance-based maintenance plan calculate the interval between start date and planned date?

Options:

A.

Cycle length divided by (monthly performance x 12)

B.

Cycle length divided by annual performance

C.

Cycle length divided by ((scheduling period) x (cycle modification factor))

D.

Cycle length divided by (annual performance/365)