iSQI CTAL-TM_Syll2012 Exam Overview :

Exam Name: ISTQB® Certified Tester Advanced Level - Test Manager [Syllabus 2012]
Exam Code: CTAL-TM_Syll2012 Dumps
Vendor: iSQI Certification: iSQI Software testing
Questions: 130 Q&A's Shared By: lisa
Question 12

During the follow-up phase the following conditions are checked:

X1. The code has been completely reviewed

X2. All the identified defects have been correctly fixed and the modified code has been compiled successfully and run through all the static analyzers used by the project without warnings and errors

X3. The modified code is available under the configuration management system with a new version number for the specified CI

If these conditions are fulfilled then the review process terminates.

Which of the following characteristics of a formal review is missing in this description?

Number of correct responses: 1

K21 credit

Options:

A.

Defined entry and exit criteria

B.

Checklists to be used by the reviewers

C.

Deliverables such as reports, evaluation sheets or other review summary sheets

D.

Metrics for reporting on the review effectiveness, efficiency, and progress

Discussion
Question 13

The main objectives the senior management team wants to achieve are:

- to reduce the costs associated with dynamic testing

- to use reviews to ensure that the project is on course for success and following the plan

- to use reviews as a well-documented and effective bug-removal activity following a formal process with well-defined roles

- to determine the effectiveness of reviews in terms of phase containment

- to improve phase containment effectiveness

Which of the following answers would you expect to describe the best way to achieve these objectives?

Number of correct responses: 1

K43 credits

Options:

A.

You should plan for lightweight exit-phase reviews at the end of each development and testing phase, and plan for a process of gathering information from testing to perform an analysis aimed at identifying the larger cluster of defects

B.

You should plan for formal exit-phase reviews at the end of each development and testing phase, and plan for a process of gathering information from testing to perform an analysis aimed at identifying the larger cluster of defects

C.

You should plan for formal exit-phase reviews at the end of each development phase and testing phase, and plan for a process of gathering information from testing to perform an analysis of the bugs found during testing to determine the people responsible for those bugs

D.

You should plan for formal exit-phase reviews at the end of each development and testing phase, and plan for a process of gathering information from testing to perform an analysis of the bugs found during testing to determine the phase in which they have been introduced

Discussion
Ilyas
Definitely. I felt much more confident and prepared because of the Cramkey Dumps. I was able to answer most of the questions with ease and I think that helped me to score well on the exam.
Saoirse Sep 17, 2026
That's amazing. I'm glad you found something that worked for you. Maybe I should try them out for my next exam.
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Sep 12, 2026
Good point. Thanks for the advice. I'll definitely keep that in mind.
Miley
Hey, I tried Cramkey Dumps for my IT certification exam. They are really awesome and helped me pass my exam with wonderful score.
Megan Sep 16, 2026
That’s great!!! I’ll definitely give it a try. Thanks!!!
Syeda
I passed, Thank you Cramkey for your precious Dumps.
Stella Sep 19, 2026
That's great. I think I'll give Cramkey Dumps a try.
Inaaya
Are these Dumps worth buying?
Fraser Sep 20, 2026
Yes, of course, they are necessary to pass the exam. They give you an insight into the types of questions that could come up and help you prepare effectively.
Question 14

Reviews

You are a Test Manager working for a software organization where reviews have never been applied. After a meeting with your managers examining a business case for reviews, (including their costs, benefits, and potential issues), the management finally decides to adopt formal reviews for future projects.

You have been given a budget that you have spent to provide training in the review process and to introduce the review process on a pilot project.

On that pilot project the introduction of reviews has been very positive in terms of positive involvement from all the participants. All the reviews applied to different documents have been very effective for their purposes (especially at revealing defects).

Which of the following answers describes an important success factor for the introduction of formal reviews which is missing in this scenario?

Number of correct responses: 1

K43 credits

Options:

A.

Management support

B.

Participant support

C.

Definition and use of metrics to measure the ROI (Return On Investment)

D.

Training in the review process

Discussion
Question 15

Reviews

You are the Test Manager of a project that adopts a V-model with four formal levels of testing: unit, integration, system and acceptance testing.

On this project reviews have been conducted for each development phase prior to testing, which is to say that reviews of requirements, functional specification, high-level design, low-level design and code have been performed prior to testing.

Assume that no requirements defects have been reported after the release of the product.

Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of phase containment effectiveness?

Number of correct responses: 2

K32 credits

Options:

A.

Number of defects found during the requirements review

B.

Total number of defects attributable to requirements found during unit, integration, system and acceptance testing

C.

Total number of defects found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing

D.

Time to conduct the requirements review

E.

Total number of defects attributable to requirements, found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing

Discussion
Page: 3 / 7

CTAL-TM_Syll2012
PDF

$36.75  $104.99

CTAL-TM_Syll2012 Testing Engine

$43.75  $124.99

CTAL-TM_Syll2012 PDF + Testing Engine

$57.75  $164.99