Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cram70off

iSQI Updated CTAL-TM_Syll2012 Exam Questions and Answers by chiara

Page: 6 / 7

iSQI CTAL-TM_Syll2012 Exam Overview :

Exam Name: ISTQB® Certified Tester Advanced Level - Test Manager [Syllabus 2012]
Exam Code: CTAL-TM_Syll2012 Dumps
Vendor: iSQI Certification: iSQI Software testing
Questions: 130 Q&A's Shared By: chiara
Question 24

Defect Management

Consider a defect report and assume that a part of its lifecycle includes the following states:

New: Is the initial state

Working: Means that the developers are addressing the defect in order to produce a fix for the defect

Clarification: Means that the developers need more information from the tester to address the defect and produce a fix for the defect and the tester is working to provide this information to the developers

Verification: Means that a fix for the defect has been produced and the tester is running the adequate tests to verify whether the fix solves the defect

Closed: is the final state

Which of the following answers represents an invalid sequence of states that can’t lead the bug report to the “Closed” state?

Number of correct responses: 1

K21 credit

Options:

A.

New, Working, Verification, Working, Clarification, Working, Verification, Closed

B.

New, Working, Clarification, Working, Verification, Closed

C.

New, Working, Verification, Working, Clarification, Working, Closed

D.

New, Working, Verification, Closed

Discussion
Question 25

Test Management

Which one of the following metrics to be produced needs traceability between the test cases and each item in a proper test basis?

Number of correct responses: 1

K21 credit

Options:

A.

Requirements coverage

B.

Trends in the lag time from defect reporting to resolution

C.

Mean time between failures for the system

D.

Cumulative number of reported defects versus cumulative number of resolved defects

Discussion
Question 26

Improving the Testing Process

Which of the following statements about the STEP test process improvement model is true?

Number of correct responses: 1

K21 credit

Options:

A.

In the STEP model, tests validate the requirements and use cases when they are developed

B.

The STEP model stresses defect detection and demonstration of capability, whereas the defect prevention is a secondary potential goal of testing

C.

The STEP model assures that the system requirements specification and the test design specification processes don't overlap

D.

In the STEP model, testware design occurs after coding

Discussion
Nia
Why are these Dumps so important for students these days?
Mary Aug 8, 2026
With the constantly changing technology and advancements in the industry, it's important for students to have access to accurate and valid study material. Cramkey Dumps provide just that. They are constantly updated to reflect the latest changes and ensure that the information is up-to-date.
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub Aug 16, 2026
That's great to hear. I am going to try them soon.
Nadia
Why these dumps are important? Can I pass my exam without these dumps?
Julian Aug 10, 2026
The questions in the Cramkey dumps are explained in detail and there are also study notes and reference materials provided. This made it easier for me to understand the concepts and retain the information better.
Cecilia
Yes, I passed my certification exam using Cramkey Dumps.
Helena Aug 19, 2026
Great. Yes they are really effective
Question 27

Improving the Testing Process

Which of the following statements about the TMMi test process improvement model is true?

Number of correct responses: 1

K21 credit

Options:

A.

In TMMi all the process areas at lower levels must be 75% complete by achieving specific and generic goals in order to claim the higher level

B.

TMMi provides an approach for test process improvement such as the IDEAL (Initiating, Diagnosing, Establishing, Acting and Learning) model

C.

TMMi has a staged architecture for process improvement with seven maturity levels

D.

At TMMi level 1 testing is chaotic without a defined process, and it is often seen as the same as debugging

Discussion
Page: 6 / 7

CTAL-TM_Syll2012
PDF

$31.5  $104.99

CTAL-TM_Syll2012 Testing Engine

$37.5  $124.99

CTAL-TM_Syll2012 PDF + Testing Engine

$49.5  $164.99