Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Huawei Updated H19-371_V1.0 Exam Questions and Answers by naia

Page: 17 / 24

Huawei H19-371_V1.0 Exam Overview :

Exam Name: HCS-Pre-sales-Digital Power V1.0
Exam Code: H19-371_V1.0 Dumps
Vendor: Huawei Certification: HCS-Pre-sales
Questions: 653 Q&A's Shared By: naia
Question 68

The input power factor (full load) of UPS5000-A is ( ), which can effectively reduce the pollution to the power grid and reduce the investment in front-end power distribution

Options:

A.

1.

B.

>0.99

C.

>0.98

Discussion
Laila
They're such a great resource for anyone who wants to improve their exam results. I used these dumps and passed my exam!! Happy customer, always prefer. Yes, same questions as above I know you guys are perfect.
Keira Jan 7, 2026
100% right….And they're so affordable too. It's amazing how much value you get for the price.
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari Jan 6, 2026
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Esmae
I highly recommend Cramkey Dumps to anyone preparing for the certification exam.
Mollie Jan 13, 2026
Absolutely. They really make it easier to study and retain all the important information. I'm so glad I found Cramkey Dumps.
Mylo
Excellent dumps with authentic information… I passed my exam with brilliant score.
Dominik Jan 1, 2026
That's amazing! I've been looking for good study material that will help me prepare for my upcoming certification exam. Now, I will try it.
Question 69

Relevant standards stipulate that the voltage drop of the AC cable needs to be controlled within 3%, and it is recommended that the voltage drop of the AC power edge be controlled within ( ) when designing the UPS system. /

Options:

A.

0.01

B.

0.02

C.

0.03

D.

0.05

Discussion
Question 70

Huawei Technologies Co., Ltd. is GB50174-2008 standard and GB50174-2017 standard

Options:

A.

Participating units, participating units

B.

Participating units, auditing units

C.

audit unit, audit unit

D.

Review unit, participating unit

Discussion
Question 71

2GUPSS000-E (50kVA power module) 150kVA, rack 1+1 redundancy, total input power distribution cabinet, the required total input switch is ( ). /

Options:

A.

250A

B.

320A

C.

500A

D.

630A

Discussion
Page: 17 / 24
Title
Questions
Posted

H19-371_V1.0
PDF

$36.75  $104.99

H19-371_V1.0 Testing Engine

$43.75  $124.99

H19-371_V1.0 PDF + Testing Engine

$57.75  $164.99