Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Huawei Updated H19-371_V1.0 Exam Questions and Answers by naia

Page: 17 / 24

Huawei H19-371_V1.0 Exam Overview :

Exam Name: HCS-Pre-sales-Digital Power V1.0
Exam Code: H19-371_V1.0 Dumps
Vendor: Huawei Certification: HCS-Pre-sales
Questions: 653 Q&A's Shared By: naia
Question 68

The input power factor (full load) of UPS5000-A is ( ), which can effectively reduce the pollution to the power grid and reduce the investment in front-end power distribution

Options:

A.

1.

B.

>0.99

C.

>0.98

Discussion
Question 69

Relevant standards stipulate that the voltage drop of the AC cable needs to be controlled within 3%, and it is recommended that the voltage drop of the AC power edge be controlled within ( ) when designing the UPS system. /

Options:

A.

0.01

B.

0.02

C.

0.03

D.

0.05

Discussion
Andrew
Are these dumps helpful?
Jeremiah Jan 19, 2026
Yes, Don’t worry!!! I'm confident you'll find them to be just as helpful as I did. Good luck with your exam!
Ayesha
They are study materials that are designed to help students prepare for exams and certification tests. They are basically a collection of questions and answers that are likely to appear on the test.
Ayden Jan 8, 2026
That sounds interesting. Why are they useful? Planning this week, hopefully help me. Can you give me PDF if you have ?
Cody
I used Cramkey Dumps to prepare and a lot of the questions on the exam were exactly what I found in their study materials.
Eric Jan 17, 2026
Really? That's great to hear! I used Cramkey Dumps too and I had the same experience. The questions were almost identical.
Erik
Hey, I have passed my exam using Cramkey Dumps?
Freyja Jan 11, 2026
Really, what are they? All come in your pool? Please give me more details, I am going to have access their subscription. Please brother, give me more details.
Question 70

Huawei Technologies Co., Ltd. is GB50174-2008 standard and GB50174-2017 standard

Options:

A.

Participating units, participating units

B.

Participating units, auditing units

C.

audit unit, audit unit

D.

Review unit, participating unit

Discussion
Question 71

2GUPSS000-E (50kVA power module) 150kVA, rack 1+1 redundancy, total input power distribution cabinet, the required total input switch is ( ). /

Options:

A.

250A

B.

320A

C.

500A

D.

630A

Discussion
Page: 17 / 24
Title
Questions
Posted

H19-371_V1.0
PDF

$36.75  $104.99

H19-371_V1.0 Testing Engine

$43.75  $124.99

H19-371_V1.0 PDF + Testing Engine

$57.75  $164.99