Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Exin Updated CDCS Exam Questions and Answers by yusra

Page: 6 / 8

Exin CDCS Exam Overview :

Exam Name: EXIN EPI Certified Data Centre Specialist
Exam Code: CDCS Dumps
Vendor: Exin Certification: EPI Data Centre
Questions: 120 Q&A's Shared By: yusra
Question 24

Where should perforated tiles be installed?

Options:

A.

At the back of racks

B.

Every 5th rack

C.

One tile per rack in front

D.

As close to AC as possible

Discussion
Question 25

Which formula is correct?

Options:

A.

Phase-to-Neutral Voltage = Phase-to-Phase voltage * 1.732

B.

Phase-to-Neutral Voltage = Phase-to-Phase voltage /1.732

C.

Phase-to-Neutral Voltage = Phase-to-Neutral voltage * 1.732

D.

Phase-to-Neutral Voltage = (Phase-to-Phase voltage * 1.732) / Phase-to-Neutral Voltage

Discussion
Nell
Are these dumps reliable?
Ernie Jun 24, 2026
Yes, very much so. Cramkey Dumps are created by experienced and certified professionals who have gone through the exams themselves. They understand the importance of providing accurate and relevant information to help you succeed.
Atlas
What are these Dumps? Would anybody please explain it to me.
Reign Jun 2, 2026
These are exam dumps for a variety of IT certifications. They have a vast collection of updated questions and answers, which are very helpful in preparing for the exams.
Zayaan
Successfully aced the exam… Thanks a lot for providing amazing Exam Dumps.
Harmony Jun 21, 2026
That's fantastic! I'm glad to hear that their dumps helped you. I also used them and found it accurate.
Pippa
I was so happy to see that almost all the questions on the exam were exactly what I found in their Dumps.
Anastasia Jun 15, 2026
You are right…It was amazing! The Cramkey Dumps were so comprehensive and well-organized, it made studying for the exam a breeze.
Question 26

Which formula is correct for a three-phase system?

Options:

A.

Phase-to-Phase Voltage = Phase-to-Neutral Voltage × 1.732

B.

Phase-to-Phase Voltage = Phase-to-Neutral Voltage ÷ 1.732

C.

Phase-to-Phase Voltage = 1 − (Phase-to-Neutral Voltage × 1.732)

D.

Phase-to-Phase Voltage = 1 − (Phase-to-Neutral Voltage ÷ 1.732)

Discussion
Question 27

The building requires sprinklers and is equipped with a wet-pipe system. What action should you recommend for the computer room?

Options:

A.

Maintain the current wet-pipe system

B.

Replace the wet-pipe system with a deluge system

C.

Replace the wet-pipe system with a pre-action system

D.

Replace the wet-pipe system with a dry-pipe system

Discussion
Page: 6 / 8

CDCS
PDF

$36.75  $104.99

CDCS Testing Engine

$43.75  $124.99

CDCS PDF + Testing Engine

$57.75  $164.99